建筑装饰施工与管理(Construction and management of building decoration).docVIP

  • 5
  • 0
  • 约1.78万字
  • 约 17页
  • 2017-10-07 发布于河南
  • 举报

建筑装饰施工与管理(Construction and management of building decoration).doc

建筑装饰施工与管理(Construction and management of building decoration)

建筑装饰施工与管理(Construction and management of building decoration) 1, the characteristics of architectural decoration construction (1) the adhesion of architectural decoration; (2) the standardization of architectural decoration construction; (3) the seriousness of architectural decoration construction; (4) the guidance of advanced decoration projects; (5) the strictness of organization and management of construction decoration; 2, construction decoration project construction projects are divided into Plastering engineering engineering engineering engineering light partition doors and windows ceiling panels (brick) wall engineering decoration engineering and engineering a soft engineering detail engineering 3 according to the points of the plastering construction Inside plastering 4, senior plastering practices One floor. Number of middle and one layer, many times survive. Yin and Yang corner to find side, set the standard reinforcement, layered drive flat. Trimming, surface pressing, light. Require smooth surface, clean, color uniform, straight lines, beautiful surface, no lines 5 internal wall plastering practices (1) find the rules (2) do ash cake reinforcement (3) to protect (to protect the wall in the room and the door opening cylinder inside corners. 1:2 cement mortar with corner, mortar water collection slightly dry with his horn, put into small fillet. The height of not less than 2m, each side width not less than 50mm.) (4) (Rough plastering middle ash scraping) (5) full skirt skirting board (6) surface layer of ash (7) cleaning 6 general requirements for decorative plastering (1) the origin, variety, batch number and mixture ratio of the materials used for decorative plastering of the same building shall be consistent with each other, and shall be professionally operated so as to achieve the same colour and lustre. Before construction, the material shall be accurately measured. After screening, the containers can be stored without leakage. (2) the plastering seq

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档