- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
专业电工考试题(Professional electrical examination questions)
专业电工考试题(Professional electrical examination questions)
Architectural electrician review questions
Fill in the blanks:
1. the directional movement of the charge is called (current), and its direction is specified as the direction of (positive charge) movement.
The three elements of the 2. sinusoidal alternating current are (maximum), (angular frequency) and (initial phase).
3. circuit breaker usually by (operation mechanism), (contact), (protection device) and so on.
4. the lightning conductor is usually made of steel wire, and its steel cross section shall not be less than (35) mm2.
5. overhead lines generally include four parts, namely (poles), (transverse), (insulators) and (insulated wire).
6. the cable core section shall be selected according to the allowable temperature rise (or current). The cable core section shall be selected according to the (voltage offset)
Check the core cross section of cable, and check the core cross section of cable according to (mechanical strength).
7. in the temporary construction of the construction site, the earthing mainly does not include (work) grounding, and (protection) earthing,
And (repeat) and lightning protection grounding four ways.
8. the directional movement of electricity will form (current), and its basic unit is (ampere (or A)).
9., three (frequency) the same, the (maximum) the same, and the phase of mutual difference (120 degrees) alternating current called three-phase alternating current.
A manual switch with a small current control circuit that is usually used for (switching on) or (disconnecting) a 10. button.
11. artificial grounding wire can generally use (Bian Gang), (Yuan Gang), (angle steel) and other steel materials.
12. temporary power system on the construction site adopts (three) power distribution system and (two) level leakage protection system,
And adopt (TN - S) zero - sum protection system.
13. earthing means the sum of the earth and earth.
14. the temporary power distribution box on the constructi
您可能关注的文档
- oracle over()函数技术详解(Oracle over()函数技术详解).doc
- oracle-linux-6.1-平台安装--database-11gr2-步骤-说明(oracle linux - 6.1 - 平台安装 - database - 11gr2 - 步骤 - 说明).doc
- oracle之plsql的变量小结(Variable summary of PLSQL's Oracle).doc
- oracle的安装(Installation of Oracle).doc
- para_ora(para_ora).doc
- oracle的完整性约束(Integrity constraints for Oracle).doc
- oracle数据库中sql基础(SQL base in Oracle Database).doc
- p46-移动互联网投资接近临界点(P46- mobile Internet investment near critical point).doc
- pb函数库之其他函数(Other functions of the Pb function library).doc
- pcb 加工基础知识(Basic knowledge of PCB machining).doc
- 新生儿消化道出血教案.docx
- 湖南省湘一名校联盟2026届高三上学期12月质量检测数学试题+答案.pdf
- 河南省商丘市2025届初中学业水平考试地理真题(含答案).doc.docx
- 质量检验员中级培训.pdf
- 鲁科版选择性必修二第三章第二节交变电流的产生提升练(有解析).doc.docx
- 黑龙江省牡丹江市第二高级中学2025-2026学年高三上学期第四次阶段性考试数学试题+答案.pdf
- 幼小衔接数学分清左右教案.docx
- 鲁科版选择性必修二第三章第一节 交变电流的特点 提升练(有解析).doc.docx
- 湖南省常德市多校2026届高三上学期第一次模拟考试数学试卷+答案.pdf
- Unit 2 My friends 单元素养培优卷(含答案,含听力原文,无听力音频).doc.docx
最近下载
- 信阳农林学院《公共英语一》2023-2024学年第一学期期末试卷.doc VIP
- 个人征信报告模板征信报告模板(2021带水印).pdf VIP
- 如何做好医患沟通(1)(1).pptx VIP
- 4.4天净沙秋思 教学课件(共29张PPT)(含音频+视频).pptx VIP
- 毕业设计(论文)-基于PLC智能分类垃圾桶设计.docx VIP
- 消防给水管道水压试验方案.docx VIP
- 标准图集-闽2004G104 钢筋混凝土桩基承台.pdf VIP
- 江苏西德电梯图纸一体机KFS25-Y4F-B110(有机房).pdf VIP
- 《桉树更新免炼山造林技术规程》.docx VIP
- 免炼山造林PPT课件.pptx VIP
原创力文档


文档评论(0)