浅谈钻孔灌注桩的施工质量控制().docVIP

  • 6
  • 0
  • 约1.35万字
  • 约 10页
  • 2017-10-07 发布于河南
  • 举报

浅谈钻孔灌注桩的施工质量控制().doc

浅谈钻孔灌注桩的施工质量控制()

浅谈钻孔灌注桩的施工质量控制() Discussion on construction quality control of bored pile Abstract: bored pile for a variety of geological conditions of adaptability, construction simple, easy to operate, and equipment investment is generally not very large, therefore, in various types of housing and civil buildings have been widely used. Bored pile construction mostly under water, the construction process can not be observed, after the pile can not be excavated acceptance. Any link in the construction problems will directly affect the quality and progress of the whole project, and even cause huge economic losses to investors. Therefore, it is necessary to strictly control the construction quality of each link during the drilling process and underwater concrete pouring process, so as to complete the construction task of the pile foundation. Key words: bored pile; quality control I. construction quality control during drilling 1 the control of water discharge from protecting cylinder: Because the soil around the buried steel tube is not dense, or tube water level difference is too big, caused by collision of casing wall drill or take water landing, can cause serious ground subsidence, tilt and displacement caused by casing, drilling, or even construction. Quality control: when burying, the pit should be layered with the clay with the best water content. Open the hole at the proper height of the retaining cylinder so that the head height of the 1.0-1.5m can be kept in the retaining cylinder. When the drill goes up and down, it should be prevented from colliding with the protecting cylinder. Found the tube take water, should immediately stop drilling, clay tamped around the reinforcement, if serious casing sinking or shift, you should re install canister. 2, hole wall collapse: Because the soil is loose and the slurry is not well protected, the surrounding of the cylinder is not filled with clay and the water level in the retaining cylinder is not high. The drilling speed is too fast,

文档评论(0)

1亿VIP精品文档

相关文档