- 2
- 0
- 约1.74万字
- 约 13页
- 2017-10-07 发布于河南
- 举报
物业管理员考试试题问答(Property management examination questions and answers)
物业管理员考试试题问答(Property management examination questions and answers)
A property company won the bid for the property management right of the newly built prosperous residential area by way of bidding. What specific data should the company check when taking over the acceptance?
Answer: the acceptance of new housing take over the acceptance of the information: 1, property rights information; project approval documents; land approval documents; building permits; demolition information. 2, technical information: 14 items.
2., Wang is just assigned to a Property Management Company university graduates, he does not know how to pay attention to the quality of new housing and acceptance of the main project, the use of functional testing, you can tell him?
Answer: the quality of the main structure and function test: the settlement shall not exceed the allowable deformation of foundation, 1; 2, deformation of reinforced concrete, crack, shall not exceed the specified value; 3, the wooden structure should be firm, 4 nodes; the masonry structure has sufficient strength; 5, the housing must meet the seismic requirements design specification.
3., a Property Management Company manager arranged for Lao Li to take over the acceptance of new housing roof project, do you know the roof project acceptance of the specific standards?
Answer: the acceptance standard of roofing engineering over: 1, in accordance with the regulations, specification for construction and acceptance of roof drainage flow, no water, no leakage; 2, flat roof should be heat insulation measures, more than 3 houses set in the roof manholes public site; 3, balcony and 3 floors above the roofs of houses should be organized drainage. The water outlet and gutters, downspouts should be installed firmly, flat interface density, no leakage.
4. the engineering manager is arranged by the manager to be responsible for the acceptance standards for the ground works of the new residential building. If one day the manager arranges f
您可能关注的文档
- 河北科技师范学院2012年艺术类专业(本科)招生简章(Hebei Normal University of Science and Technology in 2012 majoring in Art (undergraduate enrollment)).doc
- 河南驾照考试模拟试题(Henan driving test simulation test).doc
- 河道滚水坝叠石施工方案(Dieshi River overflow dam construction scheme).doc
- 油压(oil pressure).doc
- 油墨的配色要求及配墨技巧(Ink matching requirements and ink matching skills).doc
- 河套婚俗(Hetao marriage customs).doc
- 油浸式变压器的安装调试方案!(Installation and debugging plan of oil immersed transformer!).doc
- 河南广播电视大学2007—2008学年度第二学期期末考试(Henan radio and Television University 2007 - 2008 academic year second semester final examination).doc
- 油脂研究(Lipid research).doc
- 治牙疼(Cure toothache).doc
最近下载
- 传统基材润湿流平(氟碳硅烷嵌段).pdf VIP
- 南京财经大学2024-2025学年第1学期《高等数学(上)》期末考试试卷(B卷)附参考答案.pdf
- C4D课程考试试题及参考答案.doc VIP
- 2025年陕西公务员申论考试真题及答案B卷.docx VIP
- [渝粤教育] 西北工业大学 航天器控制原理 mooc 资料.docx VIP
- 航天器控制原理(西北工业大学)中国大学MOOC 慕课 章节测验 期末考试答案.pdf VIP
- 精品解析:2025年陕西省中考数学试题(原卷版).docx VIP
- 四维度主力跟踪.pdf
- 2022年陕西省中考数学真题(原卷版).docx VIP
- 大众网关控制器和bcm车身控制模块针脚定义非常有用.pdf VIP
原创力文档

文档评论(0)