- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
p_v操作(P_v operation)
p_v操作(P_v operation)
The meaning of PV operations: PV operations consist of the P operation primitive and the V operation primitive (primitive is an interruptible process), and operate on semaphores, as defined below:
P (S): reduce the value of semaphore S by 1, that is, S=S-1;
If S=0, the process continues; otherwise, the process is set as a wait state and is queued for waiting.
V (S): add the value of semaphore S by 1, that is, S=S+1;
If S0, the process continues; otherwise, the first queue in the queue to wait for the semaphore is released.
The meaning of PV operations: we use semaphores and PV operations to achieve synchronization and mutual exclusion of processes. PV operation belongs to low-level communication of process.
Semaphore:
Struct semaphore
{
Int value; / / only and must be initialized once, the initial value of non negative
PCBtype* wait_queue; / / this signal on the blocking process (pointing to the queue waiting for the semaphore next process)
}S; / / semaphore instance is S
The value of the semaphore is related to the use of the corresponding resource.
Usage method:
* P V operations occur in pairs, processing mutex occurs in the same process, processing synchronization occurs in different processes.
* synchronization P is preceded by mutually exclusive P calls, and V is sequential independent.
Using semaphore and PV operations to achieve a common model of process mutex is:
Process P1 process P2...... Process Pn
..................
P (S); P (S); P (S);
Critical region; critical region; critical region;
V (S); V (S); V (S);
........................
Among them, semaphore S is used mutually exclusive, initial value is 1.
Process synchronization using semaphore and PV operation
PV operations are one of the typical synchronization mechanisms. A message is associated with a message. When the semaphore value is 0, the expected message has not yet been generated; when the semaphore value is not 0, the desired message already exists. Using PV operations to a
您可能关注的文档
- 1山中访友(1 visit friends in the mountains).doc
- 1岁宝宝食谱做法(1 year old baby recipes).doc
- 1香梨,知道产地的人并不多(1 fragrant pear, know the origin of the people are not many).doc
- 173_20101119_2326_修复画笔_修补_污点修复画笔_颜色替换_红眼(173_20101119_2326_ repair brush _ repair _ spot healing brush _ _ eye color replacement).doc
- 2.2万考生角逐管理千个社工岗位(22 thousand candidates compete in the management of thousands of social work positions).doc
- 2.unix下dns服务器创建与管理之概述篇(Overview of DNS server creation and management under 2.unix).doc
- 20 标准日本语(中)第二十课(20 standard Japanese (middle) twentieth lessons).doc
- 20021205 注册建造师制度是我国工程建设领域的一项重要改革(20021205 registered construction engineer system is an important reform in the field of engineering construction in China).doc
- 2003年度安装专业模拟试卷2 有答案(2003 installed professional simulation test paper 2 answer).doc
- 2003级工商企业管理专业(2003 industrial and commercial enterprise management major).doc
- 西华师范大学《西方音乐史与名作赏析(二)》2023-2024学年第一学期期末试卷.doc
- 2025-2026学年小学英语二年级上册冀教版(一起)教学设计合集.docx
- 2025届安徽省合肥市第一中学高三下学期素养拓展训练4物理试题(解析版)-A4.docx
- 江西农业工程职业学院《高原特色生物资源研究进展》2023-2024学年第二学期期末试卷.doc
- 塑料 简支梁冲击性能的测定 第2部分:仪器化冲击试验及编制说明.pdf
- 2025年企业OA系统AI集成市场趋势报告.docx
- 2025-2026学年小学英语二年级上册牛津(绿色上教版)教学设计合集.docx
- 2025年物流行业员工高效培训体系构建.docx
- 《2025年物联网设备检测认证行业安全防护与互联互通报告》.docx
- 2025年智能门锁物联网边缘计算技术应用报告.docx
原创力文档


文档评论(0)