基础变形缝预溶模再造止水带防水方案研究(Study on water proof scheme of pre cast die stopping water for base deformation joint).docVIP

  • 3
  • 0
  • 约1.4万字
  • 约 10页
  • 2017-10-06 发布于河南
  • 举报

基础变形缝预溶模再造止水带防水方案研究(Study on water proof scheme of pre cast die stopping water for base deformation joint).doc

基础变形缝预溶模再造止水带防水方案研究(Study on water proof scheme of pre cast die stopping water for base deformation joint)

基础变形缝预溶模再造止水带防水方案研究(Study on water proof scheme of pre cast die stopping water for base deformation joint) Technical innovation -- Research on waterproof scheme of pre formed die renewal water stop for base deformation joint Example of Yingkou subway station in Tianjin Tianjin Metro Group Co., Ltd. technology research and Development Center Abstract: Based on the Tianjin Yingkou Road subway station as an example, on the subway Water Leakage settlement joint problems, find out Water Leakage reasons, detailed study on Water Leakage scene, the pre melting mode reconstruction of the waterstop process as Water Leakage closure schemes, and to verify the applicability of the actual construction operation and its feasibility, provide the basis for construction as a new line of settlement joint. Key words: settlement joint, water stop belt, liquid expansion rubber, pre dissolution mold technology 1. project survey and water leakage analysis: 1) engineering case overview ??? Tianjin Metro Yingkou Road Station 4 station channel, the station for connecting with multiple stores between the buildings, structures and buildings set deformation joint, and the old line transformation station, several Water Leakage during use, although after several repairs, the traditional use of polyurethane sealing material into the. Material shrinkage defect, it will always be the complete elimination of hidden, but the structure suffered varying degrees of damage. The defect for the staircase and disabled lift ceiling leaks, there is a lot of water on the ground. Removal of the ceilings and walls decorated with marble obvious cracks in the structure seam, slot width at 10 20mm, down to the original artificial chisel Water Leakage waterstop, it is found that the waterstop has cracks, displacement is not part of the original water stop. 2) cause analysis of water leakage According to the standard of 50108 - 2008 GB underground engineering waterproofing of underground waterproof construction experie

文档评论(0)

1亿VIP精品文档

相关文档