工程测量期末考试卷及答案(Final survey of engineering survey and answers)

工程测量期末考试卷及答案(Final survey of engineering survey and answers) 2011-2012 autumn engineering survey final exam answer class school name time 120 minutes open book examination form Fill in the blanks proper words into the line at. A total of 20 points 1, using the measured plane coordinate system with longitudinal north-south direction as X axis. The east-west direction of the horizontal axis is the Y axis. 2. The basic work of measurement is elevation difference measurement, horizontal angle measurement and distance measurement. 3 / field measurement datum line is a plumb line. The reference plan