混凝土技术交底(Concrete technical disclosure).docVIP

混凝土技术交底(Concrete technical disclosure).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝土技术交底(Concrete technical disclosure)

混凝土技术交底(Concrete technical disclosure) Add bookmarks to skip to the bottom of concrete technical disclosure, this article is contributed by 1191290393 DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Technical disclosure 20XX, x, x, the name of the project, the site, the name of the construction unit, concrete pouring, Lu JJ - 005 - 00x Summary: concrete pouring related materials, construction machinery, construction process, quality requirements, safety requirements. Engineering quantity 1, engineering quantity: pouring quantity is x m3. Planning cycle: plan X days to complete the process. Two, the plan period: three materials and equipment, materials and equipments: mixer, pump, pervibrator, shovel, wood trowel, iron trowel, rubber shoes, gloves etc.. Operation process: four, operation process: process: on-site mixing, conveying the concrete vibration - leveling, precausions - rolling, picking - maintenance - product protection. 1, shear wall, wall column, independent column concrete pouring: first, pouring column, wall concrete must be watered wet construction joints at the concrete surface, but the surface can not have water, in order to ensure the combination of solid. When pouring, use the same stone mortar with the same proportion for mortar, the thickness is 5-10 cm, mortar with shovel into the mold, not allowed to use the hopper directly into the mold. The layered continuous casting, control of pouring thickness, vibration thickness should be 50cm, a pulp after the first concrete pouring 50cm and insert vibrating rod inserted into the column four column will tap root angle after built into the concrete shear wall and column pouring into 3 steps, in addition to the first step, each step of 120cm finally one step to the end of a beam, on the periphery of Ping line. After pouring, in a timely manner will be stretched out of the steel reinforcement in place, a

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档