钢结构室内篮球馆工程
施工组织设计
目 录
1 施工组织设计编制说明与工程概况···········································12
1.1施工组织设计编制原则和依据···········································12
1.2工程概况·························································12
1.3工期目标·······················································13
1.4工程质量目标··················································13
1.5安全目标·····················································13
1.6文明施工目标··················································13
2 工程进度计划及材料供应········································14
2.1主要用材·····················································14
2.2工程进度计划安排·····················································14
2.3材料供应计划·····················································14
3施工组织管理···························································15
3.1项目管理组织机构和主要施工管理人员配置·······························15
3.2施工管理准备工作·····················································16
3.3施工队伍进场筹备工作·················································17
3.4劳动力配置·················································17
3.5机械设备配置·················································17
4主要施工方法·······················································18
4.1土建施工·················································18
4.2构件的预制和运输·················································18
4.3钢结构安装·················································24
4.4油漆、防火涂料的施工·················································26
4.5彩钢板安装·················································26
4.6其他工程·················································26
5施工过程管理·······························································27
5.1流水作业施工·················································27
5.2物资采购供应·················································27
5.3做好施工过程的协调配合工作···········································28
5.4做好服务工作措施·················································29
5.5做好工程资料管理措施·················································29
6工期、质量、安全、环保、文明施工等保证措施·····································29
6.1工期保证措施···········
您可能关注的文档
- LED显示屏系统钢结构制作及安装工程合同书.doc
- 博物馆建设工程BT模式投资建设合同.doc
- 办公用纸张及办公耗材供货协议.doc
- 策划顾问及招商代理合同.doc
- 柴油发电机项目采购合同.doc
- 茶楼委托管理合同.doc
- 柴油发电机组环保工程总合同.doc
- 车辆数据提供合同书.doc
- 产业集聚区道路工程投资建设合同(BT模式).doc
- 大厦维修改造项目装修施工合同范本.doc
- 2012-2021北京重点校高一(下)期中语文汇编:词类活用.pdf
- 电力市场与经济运行优化:电力市场优化算法_(28).电力市场中的市场力分析.docx
- 医院培训课件:《俯卧位通气的护理》.pptx
- 电力市场与经济运行优化:电力系统能效优化方法_(1).电力市场基础理论.docx
- 电力市场与经济运行优化:电力系统能效优化方法_(9).电力系统运行与能效优化.docx
- 电力市场与经济运行优化:电力系统能效优化方法_(15).电力市场与环境影响分析.docx
- 电力市场与经济运行优化:电力系统优化调度_(1).电力市场基础与原理.docx
- 电力市场与经济运行优化:电力系统优化调度_(14).电力市场改革政策与影响.docx
- 电力市场与经济运行优化:电力系统运行优化_(4).电力系统运行基础.docx
- 2025年航运行业分析.docx
最近下载
- 人力资源6大模块培训讲解.pptx
- 2024建筑消防设施检测技术规程.docx VIP
- 《大学英语》 开学第一课 .pptx VIP
- NB_T 32042-2018 光伏发电工程建设监理规范_OCR.pdf
- 保时捷Boxster, Boxster S_2010款_汽车使用手册用户操作图解驾驶车主车辆说明书电子版.pdf
- 高中生物课堂实践:校园植物多样性图谱绘制与生态教育探索教学研究课题报告.docx
- 抗菌药物管理持续改进案例.docx VIP
- 《中国植被类型分布》课件.ppt VIP
- 吉林省长春市东北师范大学附属中学2024-2025学年高二上学期10月期中考试英语试题(解析版).docx VIP
- 人教版小学数学四年级上册全册课件.ppt VIP
文档评论(0)