同集路土方方案5(现用)
同集路集美段旧城改造安置房1#-6#楼
(第二标段)地下室基坑支护土方开挖工程
专
项
安
全
施
工
方
案
福建璟榕工程建设发展有限公司
2009年8月25日
目 录
1.编制依据············································5
1.11设计文件···········································5
1.12规范、规程··········································5
1.13标准···········································6
1.14主要法规···········································6
1.15其它···········································6
第一部分:施工技术方案
第一章:工程介绍············································7
1.1工程概况············································7
1.2工程地质及水文地质条件···········································7
1.3现场的基本情况······································8
1.4编制说明······································8
1.5编制目的············································9
第二章:基坑支护设计概况··································10
2.1支护形式一:东侧(桩锚结合喷锚的支护)······················10
2.2支护形式二:南侧(悬臂桩支护)······················11
2.3支护形式三:西南侧(放坡支护)······················12
2.4支护形式四:西侧(土钉墙壁支护)······················12
2.5支护设计说明···································12
2.6、土方开挖设计方案···································13
第三章:施工准备及主要部署·········································14
1、施工准备·················································14
1.1人员准备·················································14
1.2劳动力实施········································14
1.3劳动力配置········································14
1.4劳动力组织和管理的关键环节······························15
1.5施工机械设备准备···········································15
1.6施工现场准备···········································15
2、施工部署及施工方法··········································16
2.1冲孔围护桩施工···································16
2.2桩顶冠梁施工··········································18
2.3预应力锚索施工·········································18
2.4腰梁施工·········································19
2.5东侧护坡面喷护及桩间喷射砼···································20
2.6土方开挖········································20
2.7西南侧放坡支护····································27
2.8西侧土钉墙施工··································27
2.9沉降、位移监测及应急抢险措施······························