- 1、本文档共51页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
沃尔玛产品检验标准
WALMART Stores, Inc.
1. Introduction(略)
2. Regulatory Compliance 符合规定
Walmart Suppliers must comply with all laws, including Federal, State and Local laws, as required under the Supplier Agreement.
供应商必须按供应商协议要求遵守联邦、州和地方法律。
3. Footwear Testing Program 鞋测试程序
This is an annual testing program that involves testing of the following samples:年度测试程序包括测试以下样品:
Footwear Pre-Production/Components Testing 鞋产前/部件测试
Production Testing of Complete Shoe 整鞋的生产测试
In-Store Testing 场内测试
Warehouse Testing 仓库测试
Other testing at the request of the Walmart New York Office Technical Department or Compliance Department 沃尔玛纽约办公室技术部或合规部要求的其他测试
3.1 流程图
Footwear Pre-Production/Component Testing Process 鞋产前/部件测试流程
Manual Name: Walmart USA Footwear Revised: April 2010 4
Footwear Production Testing Process 生产测试流程
NOTE1 Refer to Section 3..3.1 Production Testing Incentive Program incorporated into Production process.NOTE2 Childrens items are tested for restricted substances at each production accumulation level.NOTE3 Direct Import and First Cost orders require testing (POCO) prior to shipment to the states. Domestic landed orders require Warehouse Testing (POCO) prior to allocation of order to the
stores (refer to Section 3.3.2 of this manual).Manual: Walmart USA Footwear Revised: April 2010 5
In-Store Quality Audit Process 场内测试流程
Note1All items pulled from the store at least 1 x per year.Replenishable items pulled from the store 1 or 2 times per year based on Supplier performance (refer to section 3.3.1 of this manual)Manual Name: WM USA Footwear Revised: April 2010 6
Footwear Production Warehouse Testing (POCO) Process仓库测试(POCO)流程
Manual: Walmart USA Footwear Revised: April 2010 7
3.2 Footwear Pre-Production/Component Testing 鞋产前/部件测试
It is the Supplier’s responsibility to ensure that all footwear components and/or pre-production samples are submitted to the laboratory on a timely basis and no later than 60 days prior to the ship date.供应商应当确保及时且不迟于装船前60天将部件和样品送检。
Footwear Compo
您可能关注的文档
- 施工声像档案资料培训_SPM.ppt
- 施工现场质量管理制度(正式使用).doc
- 施工现场质量检查用表格.doc
- 新闻中心2011工作计划(稿).doc
- 施工组织设计_工作计划_计划解决方案_实用文档.doc
- 施工现场QC资料_PKN.ppt
- 施工计划工作管理知识.ppt
- 施工质量控制流程及控制要点(样板展示区内95×8m).doc
- 施工升降机安装检查验收表.doc
- 无机房电梯监督检验原始记录.doc
- 某区纪委书记年度民主生活会“四个带头”个人对照检查材料.docx
- 某县纪委监委2024年工作总结及2025年工作计划.docx
- 某市场监督管理局2024年第四季度意识形态领域风险分析研判报告.docx
- 县委书记履行全面从严治党“第一责任人”职责情况汇报.docx
- 税务局党委书记2024年抓党建工作述职报告.docx
- 某市税务局副局长202X年第一季度“一岗双责”履行情况报告.docx
- 副县长在全县元旦春节前后安全生产和消防安全工作部署会议上的讲话.docx
- 某市委书记个人述职报告.docx
- 某县长在县委常委班子年度民主生活会个人对照检查材料1.docx
- 某县长在县委常委班子年度民主生活会个人对照检查材料.docx
文档评论(0)