- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中英文对照干舷计算书
The Basis of Freeboard Calculation
The calculation shall be in accordance with International Convention on Load Line 1966 with amendment for 1979, modified by protocol of 1988 for Type “A” ship.
Primary Parameter for this vessel
LBP = 90.0 m
B = 15.0 m
D = 6.9 m
T = 5.4 m
( = 5607.7 t
Defined Parameter for this vessel
Length L
LWL(0.85D) ( 96% = 92.064 ( 96% = 88.381 m
LPP(0.85D) = 90.079 m
so: L = 90.079 m
Breadth B
B = 15.0 m
Depth D
D = 6.9 m
Calculated Depth D1
D1 = 6.9 + 0.012 = 6.912 m
Block Coefficient Cb
where: d1 = 0.85D = 5.865 m
( = 5995.0 m3
0.68
Freeboard Calculation
This vessel to be “A” type ship.
Minimum Freeboard F = F0 + f1 + f2 + f3 + f4 + f5 + f6
Base Freeboard F0
F0 = 985.185 mm
Length Correction f1
This vessel is type “A” ship,
so: f1 = 0
Block Coefficient Correction f2
where: f1 = 0
Cb = 0.7565
so: f2 = 55.417 mm
Depth Correction f3
where: R = L/0.48 = 187.665
D1 = 6.912 m L/15 = 6.005
L = 90.079 m
so: f3 = 170.162 mm
Superstructure Correction f4
The height of forecastle and poop is 2.70m and larger than standard height H1=1.951m and the length of superstructure is 6.716+21.6+0.015=28.331m=0.315L, so k is 0.225 according to the table and f0 is 888.894 mm,
f4 = f0 ( k
so: f4 = 199.986 mm
Non-standard Sheer Correction f5
The ordinates of standard sheer profile
Station Formula Ordinate(mm) Factor Product After half After perpendicular 25(L/3+10) 1000.658 1 1000.658 L/6 from A.P. 11.1(L/3+10) 444.292 3 1332.876 L/3 from A.P. 2.8(L/3+10) 112.074 3 336.222 Amidships 0 0 1 0 Forward half Amidships 0 0 1 0 L/3 from F.P. 5.6(L/3+10) 224.147 3 672.441 L/6 from F.P. 22.2(L/3+10) 888.585 3 2665.755 Forward perpendicular 50(L/3+10) 2001.317 1 2001.317
The standard average height of sheer:
After half
Forward half
The actual height of sheer to be 0mm both after and forward half.
Because forecastle height 2.911m is greater than the standard 1.951m, sheer credit is given for the forecastle:
where: y = 2.911
您可能关注的文档
- 中职《航空运输地理》课程标准.doc
- 中考风向标物理第一部分 第九章 电功率 [配套课件].ppt
- 中职-电工基础-10三相正弦交流电-2017年10月.ppt
- 中职数学6.2.2等差数列的前n项和复习.ppt
- 中职数学基础模块上册《利用三角函数值求指定范围内的角》ppt课件1-2017年10月.ppt
- 中职数学基础模块上册《利用三角函数值求指定范围内的角》ppt课件4-2017年10月.ppt
- 中职数学基础模块上册《弧度制》ppt课件.ppt
- 中考面对面湖南省2017中考历史第二部分专题突破专题十一中国历史上的海洋问题__南海课件.ppt
- 中职无线电基础教案.doc
- 中职生就业形势与政策法规.ppt
文档评论(0)