网站大量收购独家精品文档,联系QQ:2885784924

冷气控制系统方式.pptx

  1. 1、本文档共31页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
冷气控制系统方式

Air-Conditioning Optimization Control Strategies;Work with Polytechnic University (PolyU) To conduct building life cycle testing and commissioning in ICC To identify and implement energy saving strategies on the main chiller plant system;Optimized chiller sequencing control (0.68MkWh/year) Optimized cooling tower control (0.33MkWh/year) Optimized PCHWP for HX (1MkWh/year) Optimized HX control logic (0.25MkWh/year);Original Control: If cooling load 1000 RT, then operating chiller 2-1;Original Control: If cooling load 1000 RT, then operating chiller 2-1;2. Optimization of Cooling Tower Control;;;Optimized fresh air control (1MkWh/year) Tackled deficit flow problem (0.25MkWh/year) Optimized the thermal comfort level of common area (0.16MkWh/year) and the operating schedule of PAUs and ventilation fans for podium level (G/F to L9) and Carpark floors (B1/F to B4/F) (0.16MkWh/year) Applied the revision of sewage discharge factor for water cooled chiller with cooling tower system ;10;11;12;13;14;15;Optimized control of secondary pumps for AHUs (0.17MkWh/year) Optimized the pressure reset of control strategy for AHU (1MkWh/year) Further eliminated the deficit flow during the daytime with one chiller in operation (0.76MkWh/year) ;Constant differential pressure control Pump speed varies as per AHU valve opening;Optimize the AHU valve opening Reduce the resistance of water loop Save more pump power;1. Optimize control of secondary pump for AHU;Typical AHU VAV system;Around 100 nos. VAV box/floor;Current AHU static pressure reset control strategy;Deficiency of current AHU static pressure reset control strategy ;Deficiency of current AHU static pressure reset control strategy ;Deficiency of current AHU static pressure reset control strategy ;2. Optimize the pressure reset of control strategy for AHU;3. Further elimination of the deficit flow;Energy Performance ;Energy Performance;Energy Saving Analysis;Energy Saving Analysis

文档评论(0)

wyjy + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档