复压摊铺混合料施工办法 在混合料完成摊铺和刮平后应立即对路面进行检查,对不规则之处应及时用人工进行调整,随后进行充分、均匀的压实。压实分为初压、复压和终压,压路机应以均匀速度行驶。压实设备必须配有钢轮压路机、大吨位轮胎压路机及大吨位振动压路机,能按合理的压实工艺进行组合压实。并应备有经监理工程师所认可的小型振动压路机或手扶振动夯具,以用于在狭窄地点压实或修补工程。 Done in mixture paving and leveling shall be carried out on the road immediately after inspection, should be timely to the irregular differences with artificial adjustment, then adequately, uniform compaction. Compaction is divided into the early pressure, pressure and pressure, roller should be moving at uniform speed. Compaction equipment must be equipped with steel roller, large-tonnage tyre roller, and a larg