- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
成套设备出口合同范本附
?? Contract for Exporting Mining Equipment
?
Contract No. ____
?
?
This Contract is made and entered into on the 15th,Oct. in Sulaiminiyh by and between Mass Iraq Cement Co,Ltd ( as the Buyer) and China Jiangsu Grand Economic Devolpment Co.,Ltd. a company incorporated under the laws of China(hereinafter referred to as the seller).
?
Whereas, the Buyer desires to engage the Seller to provide the Mining Equipment, all related design, technical document, technical service and technical training and to obtain from the Seller a license of know-how and other technical information in relation with the Equipment’s design, erection, commissioning, operation and maintenance. Now it is hereby mutually agreed as follows:
?
Article 1 Definitions
?
1.1 “Acceptance ”means the Buyer accepted the Equipment in accordance with Article xx.
?
1.2 “Commissioning” means the operation of the Equipment in accordance with Article 9.4 for the purpose of carrying out Performance Test.
?
1.3 “Contract” means this Contract signed by and between the Buyer and the Seller, including Appendices attached which shall form an integral part of this Contract.
?
1.4 “Effective Date of the Contract” means the date when the Contract enters into force upon fulfillment of all the conditions stated in Article 16.1.
?
1.5 “Equipment” means the equipment, machinery, instruments, spare parts and materials supplied by the Seller as listed in Appendix 3.
?
1.6 “Erection” means the installation of the Equipment including placing and connecting parts to their positions according to the design drawing.
?
1.7 “Job Site” means the site where the Equipment shall be located and/or erected, namely Mass Iraq Cement Plant.
?
1.8 “Last Shipment” means the shipment with which the accumulated invoice value of shipped goods has reached 100 percent of the total the Equipment price.
?
1.9 “Performance Test” means the tests for examining whether the Equipment is able to meet guarantee figures .
?
1.10 “Technica
您可能关注的文档
- 心理实验设计方案书试卷.doc
- 心理测量学基本概念与常考公式附其计算.doc
- 心理测验技能案例分析报告.doc
- 心电图机标准附各类产品性能参数对比.doc
- 心理测验SPSS上机信度分析报告.doc
- 心理学研究报告方法.doc
- 心脏解剖分析报告.doc
- 德国CMC氯气氯化氢微量水分析报告仪.doc
- 心血管内科试题附答案.doc
- 微软私有云规划附最佳实践.doc
- 2025年鸡西市麻山区公益性岗位招聘8人(公共基础知识)测试题附答案.docx
- 杭州之江湾股权投资基金管理有限公司招聘参考题库附答案.docx
- 2026江苏辖区农村商业银行常熟农商银行校园招聘200人(公共基础知识)测试题附答案.docx
- 2025年中国石油新疆油田分公司秋季高校毕业生招聘360人(公共基础知识)综合能力测试题附答案.docx
- 2023年攀枝花市直属机关遴选公务员笔试真题汇编附答案解析(夺冠).docx
- 2026广发银行太原分行校园招聘(公共基础知识)测试题附答案.docx
- 2025四川成都医学院招聘事业编制辅导员10人(公共基础知识)测试题附答案.docx
- 2026年毛概期末考试试题库必考题.docx
- 2025年合肥市某国有企业2025年岗位外包招聘(公共基础知识)测试题附答案.docx
- 2026年重庆青年职业技术学院单招(计算机)测试模拟题库附答案.docx
原创力文档


文档评论(0)