- 3
- 0
- 约23.21万字
- 约 475页
- 2017-11-22 发布于广东
- 举报
Unit 9 Producing Drawings Despite the claims made about paperless mold design, all toolmakers still require some drawings for their manufacturing, inspection and assembly departments. However, software suppliers have made considerable steps to automate the process for creating drawings. For example, the new drawing production process within some CAD/CAM software can generate automatically the General Assembly and all of the component drawings required for manufacturing and inspection (see Figure 9-9). With this high degree of automation, the time needed to produce a complete set of drawings fo
您可能关注的文档
- 楼宇自动化技术与应用陈虹楼宇自动化技术与应用2013版4章节.ppt
- 楼宇自动化技术与应用陈虹楼宇自动化技术与应用2013版2章节.ppt
- 楼宇自动化技术与应用陈虹楼宇自动化技术与应用2013版7章节.ppt
- 楼宇自动化技术与应用陈虹楼宇自动化技术与应用2013版6章节.ppt
- 楼宇自动化技术与应用陈虹楼宇自动化技术与应用2013版5章节.ppt
- 楼宇自动化技术与应用陈虹主编第1章楼宇自动化技术概述.ppt
- 楼宇自动化技术与应用陈虹主编第2章集散控制系统.ppt
- 楼宇自动化技术与应用陈虹主编第3章现场总线控制系统.ppt
- 楼宇自动化技术与应用陈虹楼宇自动化技术与应用2013版8章节.ppt
- 楼宇自动化技术与应用陈虹主编第4章楼宇设备自动化系统.ppt
原创力文档

文档评论(0)