【精选】1B1401-N418-CP-03RB Provision unit Commissioning procedure.pdfVIP

  • 2
  • 0
  • 约8.24万字
  • 约 19页
  • 2017-11-29 发布于贵州
  • 举报

【精选】1B1401-N418-CP-03RB Provision unit Commissioning procedure.pdf

【精选】1B1401-N418-CP-03RB Provision unit Commissioning procedure

DOCUMENT FRONT PAGE Type of Document : Commissioning procedure Project doc. No.: 1B1401 Project: Sevan 650 Drilling NO.3 Owner: Builder: Supplier: Sevan Drilling Tag No.: Package description: Other Info: HVAC- Systems Client Approval Codes: Note : The review of this document does not relieve the supplier of the responsibility for the design, fabrication and performance of the equipment or any contractual obligations. 3 – Approved without comments. Proceed. 2 – Approved with comments enclosed. Incorporate. Revise and Re-submit. Proceed. 1 – Not Approved. Re-submit for approval. Do not proceed. NAME : __________________________________ SIGN : __________________________________ DATE : ______________ For codes 3, only front page of document will be returned with signature. Minor comments may be added to code 3 documents, with note that document need only be re-issued at as built stage. Turnaround period is 14 working days. Revision Index: B 01.11.12 Issued for Approval ALZ LLQ RXU A 20.08.12 Issued for Approval ALZ LLQ RXU Rev. Date Description Made Checked Approved

文档评论(0)

1亿VIP精品文档

相关文档