Optimization and Practice of 300t Converter Bottom Blowing Technology at Baosteel 论文.pdfVIP

  • 2
  • 0
  • 约2.34万字
  • 约 7页
  • 2017-12-05 发布于浙江
  • 举报

Optimization and Practice of 300t Converter Bottom Blowing Technology at Baosteel 论文.pdf

Optimization and Practice of 300t Converter Bottom Blowing Technology at Baosteel ·1 · Optimization and Practice of 300t Converter Bottom Blowing Technology at Baosteel Jiang Xiaofang, Mou Jining, Zhang Min, Zhang Geng (Steelmaking Plant of Baoshan Iron Steel Co., Ltd., Shanghai 200941, China) Abstract During the pre- and middle periods of one whole BOF campaign in 300 t converters at Baosteel, bottom tuyeres status is good so that the effect of combined blowing is more obvious. But during the later period of the campaign, with the increase of furnace lining life, the tuyeres would have been blocked or even closed, this would bring a negative impact on the cost and quality of steel. In order to solve these problems, some measures and ways are adopted. Developing a new type of bottom tuyeres improved the metallurgical results of combined blowing during the latter period of the campaign. The converter bottom refractory structure was optimized to prevent the abnormal erosion of refractory nearby the converter bottom corner. According to the different production schedule, converter lining life and bottom blowing conditions, the maintenance mode of bottom tuyeres was determined. Coating technology were implemented to reduce the erosion of bottom tuyeres. Through three years of continuous improvement, the effect of converter combined blowing during the whole campaign, especially in the later period of the campaign, is improved obviously. The ratio of converter combined blowing increases from 79.2% to 100%, the value of [%C]. [%O] at endpoint in BOF decreases from 0.00334 to 0.00228, a decrease of 30.9%, the index of

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档