Order and quality standard.
Four, the main construction machine need a dosage plan
This engineering is under construction, we will with exaltation mechanization level for principle, enter a field in time with the work project
Various machine tool to ensure that the engineering mainly enters a construction machine smoothly progress.(see table 4-1)
Table 4-1 main construction machines plan
The ordinal number machine tool name set number model number enters a field for time
1 anti- spade excavation machine 1160 open man-hour
2 from unload a car 8 to open man-hour
3 beat a popular machine 4 HWs-16s to open man-hour
4 theodolites 1 JS2s start work ex-
5 level instrument 2 DZS2s start work ex-
6 laser vertical instrument 1 opening front
7 concrete mixers 4 JZC400ses open man-hour
8 concrete agitations stand one to open man-hour
9 flat panels flap the Dao machine 4 ZX75s to open man-hour
10 inserts type flap a Dao machine 20 sets of ZX75s to open man-hour
11 concretes transport an equipments 2 sets of open man-hour
12 electric welding machine 4 BISs-330ses open man-hour
13 electricity residue pressure Han machine 2 LZF32ses open man-hour
14 flashlights to Han machine 2 open man-hour
15 electricities saw 2 open man-hour
16 electricities plane 2 open man-hour
17 finish from the rise type elevator in the door 2 foundation constructions
18 towers mourn a 80 Ts-M to open man-hour
19 people goods two use elevator 16 F the corpus is over
Five, the main item engineering start construction method
(A)Foundation
1.soil square engineering and protection measure
(1)According to this engineering circumstance, the radicle pit opens to dig to adopt a machine to open to dig to assist for lord, artificial fixing a side ascent for,
Because the place is narrow, open to dig to put performances least of ascent coefficient to stipulate one ∶ 0.5, adopt a set excavation machine to dig soil, 8 from
Unload car match luck soil.Remaining soil carries into construction unit appointed the location Be p
您可能关注的文档
- 蜜蜂引路教案和板书.docx
- 第七课 可爱的蜜蜂.doc
- 第三节 带回流线的直接供电方式.doc
- 2011六级阅读核心词汇.doc
- VLSI 复习题与思考题.doc
- 四六级考前看.doc
- 数字摘要技术与数字签名.doc
- 高考英语动词.doc
- 大学四六级英语考试 核心词汇(一).docx
- 蜜柑 芥川龙之介 日文原版.docx
- 2023年江苏省镇江市润州区中考生物二模试卷+答案解析.pdf
- 2023年江苏省徐州市邳州市运河中学中考生物二模试卷+答案解析.pdf
- 2023年江苏省苏州市吴中区中考冲刺数学模拟预测卷+答案解析.pdf
- 2023年江苏省南通市崇川区田家炳中学中考数学四模试卷+答案解析.pdf
- 2023年江西省吉安市中考物理模拟试卷(一)+答案解析.pdf
- 2023年江苏省泰州市海陵区九年级(下)中考三模数学试卷+答案解析.pdf
- 2023年江苏省苏州市高新二中中考数学二模试卷+答案解析.pdf
- 2023年江苏省南通市九年级数学中考复习模拟卷+答案解析.pdf
- 2023年江苏省南通市海安市九年级数学模拟卷+答案解析.pdf
- 2023年江苏省泰州市靖江外国语学校中考数学一调试卷+答案解析.pdf
文档评论(0)