工程造价专业英语A卷.doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程造价专业英语A卷

乐山师范学院 2014 - 2015 学年第 2 学期期末考试 《 工程造价专业英语 》试卷说明:To?some?degree?,each?construction?project?is?unique?,and?no?two?jobs?are?ever?quite?alike?. 2、The?initial?step?is?to?prepare?a?list?of?all?available?contractors.? 3、.It?is?important?to?give?prospective?suppliers?and?subcontractors?as?much?time?as?possible?in?which?to?prepare?their?own?quotation. .4、It?is?always?preferable?to?use?one?of?the?standard?forms?available?,rather?than?to?devise?one’s?own?personal?form. 5、In order to avoid any future misunderstandings,it is preferable to have a written agreement between the employer and the builder. 得分 三、阅读题:(2小题,1小题36分,2小题24分,共60分) Construction Management In construction management the owner contracts with an architect-engineer for construction project design and with a construction management firm consulting , procurement, contract letting, and construction administration services. In so doing, a construction team is created consisting of the owner, the architect-engineer, and the construction manager(CM). The objective of this approach is to treat construction project planning, design, and construction as integrated tasks within a construction system. The CM works with the owner and the architect-engineer from the beginning of design until construction project completion, providing leadership to the construction team in all matters pertaining to construction. Adherence to construction schedules and budget constraints is the CMs prime responsibility. During the design phase, the CM advises with respect to performance criteria, construction feasibility of alternative building systems, site conditions, site conditions, and availability of materials and labor. Information pertaining to trade jurisdictions and temporary job facilities is also provided. Where long lead-time machinery, equipment, or materials are needed , the CM will make arrangements for their procurement and delivery. During the design process, the CM prepares preliminary, interim, and final con

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档