outbidv.出价多于(他人)(outbid出价出价超出).docVIP

outbidv.出价多于(他人)(outbid出价出价超出).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
outbidv.出价多于(他人)(outbid出价出价超出)

The Ning soil strength grade C35, the anti- oozes the grade S8.No.4 building design the scaleboard is thick 400, the foundation covers up to place depth The 5.80~6.20 ms, the partial 6.80 ms, shears a dint wall thickness 250, 300.Ground floor scaleboard, shear a dint wall, The pond designs concrete strength the grade C35, the anti- oozes the grade S8.2, 3, the 5th floors design to adopt φ 800 blunt Grasp into bore to infuse to note a stake, total 193 stakes, concrete strength the grade C20. 3 This engineering corpus structure adoption frame structure presses 6 degrees consideration anti- earthquake to establish to defend.The corpus structure mixs Ning The soil strength grade is a C25, C30.The No.1 building establishes two stretch and shrinks to sew in 1~8 stalks and 1~13s, frame The structure acrosses a degree to regard 6 ms as principle, the close together pillar is apart from to regard 8 ms as principle.The No.2~5 building opens to regard 3.9 ms as principle, Acrossing a degree is between 5.7~6.60 ms.The Yan ditch adoption hangs to pick structure and hang to pick width biggest reach to 2.825 ms, Yan Ditch inclined planks biggest height reaches to 3.6 ms.The frame fills a wall adoption clay to burn to knot many bore bricks and burn to knot common brick, Among them elevator well part all the adoption burn to knot common brick to carve to build. 1.Decorate engineering main way of doing Outside wall adoption flower Gang stone the stem hang and glass act the wall combine together of adornment skill, do to hang to spend a Gang stone among them The area of act wall is a 30200 ms 2, mainly adopt a 25 mm 635 fires in Fukien burn plank, the act wall lord main beam of boat BE Plate a zinc slot steel on the 10th, the horizontal file adopts No.5 angle steel, the plank material passes a short slot type of thick stainless steel code of 5 mm conjunction. 2.Inside wall way of doing (1)Dub out marble to stick noodles The big hall and elevator wall noodles of this engineering hangs

文档评论(0)

xcs88858 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档