英文CAPELLA.doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
英文CAPELLA

Production plan and shipment scheme for the CAPELLA?HOTEL Project This scheme is prepared for the curtain wall project of CAPELLA?HOTEL and serves as the comprehensive technical document for regulating and guiding such project from the purchase and transportation to the field inspection. To enable this special project to be organized and constructed in a standard manner as per the scientific rules during the whole construction process, timely complete the preparation of all kinds of works, guarantee the timely supply of all kinds of resources and labor, coordinate the time arrangement for all kinds of work, ensure the smooth proceeding of the construction and complete the construction tasks as per the schedule and quality, we hereby formulate this special scheme. I. Basis for preparation: Documents relevant to the construction drawings. II. Engineering contents: 1. Stone curtain wall for the external wall project? A. Design the material preparation form as per the curtain wall project and formulate the purchase plan. B. The processing of stone materials requires 75 working days, which will start from August 1 and end on October 15. C. Formulate the shipping plan in accordance with the construction scheme. The customs clearance and transportation of stone materials will be conducted for twice: The 30mm thick granite materials will be handled as the first batch. It will be reported to the customs and shipped on September 15, the shipment till the Bangkok Port in Thailand is 20 days and the customs clearance and transportation to the site require 5 working days. The 40mm thick sandstone materials will be taken as the second batch. It will be reported to the customs and shipped on October 5, the shipment till the Bangkok Port in Thailand is 20 days and the customs clearance and transportation to the site require 5 working days. D. The installation period: From Oct. 15, 2016 to Jan. 15, 2017. 2. Unitized curtain wall project A. Design the material

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档