- 1、本文档共36页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
HP供应商宝典
Supplier Management Process
Quality Survey
INTRODUCTION
Upon review of the pre-survey information from the supplier, the HP team, at its discretion, will elect to conduct an on-site survey.
The intent of the survey is to allow HP the opportunity to evaluate the supplier’s quality, engineering, capacity, financial, and manufacturing capabilities relative to critical parameter and business requirements. The survey is intended to identify areas within the supplier’s operations, which may require improvement plans in order to meet HP’s requirements and establish a long-term business relationship with HP.
The on-site survey will be scheduled through HP’s Commodity Manager or Procurement Engineer. An itinerary for the survey is forwarded to the supplier in order to allow the supplier adequate time to prepare prior to the HP team’s arrival. Surveys are conducted at the convenience of the supplier; every effort is made not to interfere with normal business activity.
At the start of the on-site survey, the HP Procurement Engineer or Commodity Manager reviews the itinerary with the supplier’s management team. This review is to ensure that the survey process proceeds in a smooth and productive manner.
Upon completion of the survey, the HP team will meet off-site to discuss the scoring of the survey and correlate the HP team’s appraisal to the supplier’s self-appraisal. Upon reaching a consensus, a review session is held with the supplier’s management team to summarize the survey results and address concerns highlighted during the survey. If appropriate, the supplier and HP will develop an improvement plan and milestone schedule follow-up action items and/or future activity.
The following sections offer detailed descriptions of each quality system element to be evaluated as well as the method to be used for evaluation.
ELEMENT #1: QUALITY MANAGEMENT
1. Is there a formal company Quality Policy and are Quality objectives and responsibility clearly stated (including or
您可能关注的文档
- fun 的用法.doc
- 上海牛津版七年级下U5词组纸.doc
- 读博,读什么.docx
- 六级高级句子.doc
- 2012年12月英语六级考试阅读专项训练.docx
- 0-3岁儿童心理学.docx
- 大学体验英语听说教程第一单元听力原文.doc
- 交通灯信号灯程序.doc
- 2013年高考英语一轮复习课时作业18:Unit 3 A taste of English humour(新人教版必修4陕西专用).doc
- 专业四级必备新闻高频词汇.doc
- 2023-2024学年《面向对象程序设计》模拟试卷及答案解析1.pdf
- 2023-2024年演出经纪人之演出经纪实务题库综合试卷全面.pdf
- 2023—2024学年2学期考试卷(电力系统继电保护)答案版.pdf
- 2023-2024学年安徽省安庆市枞阳中学高二地理期末联考含解析.pdf
- 2019年大学JAVA程序语言设计期末考核题库500题(含答案).pdf
- 2023-2024年演出经纪人之演出经纪实务考前冲刺模拟试卷(典优).pdf
- 2023-2024年演出经纪人之演出经纪实务能力测试试卷(考试直接用).pdf
- 2023-2024年公务员省考之行测高分题库附答案.pdf
- 2023-2024年演出经纪人之演出经纪实务能力测试试卷含答案(a卷).pdf
- 2023-2024年义务教育教辅材料和地方教材采购项目招标文件.pdf
文档评论(0)