网站大量收购独家精品文档,联系QQ:2885784924

Quality System Evaluation Checklist 质量体系评估.doc

Quality System Evaluation Checklist 质量体系评估.doc

  1. 1、本文档共27页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
3. REQUIREMENTS Element Proofed: 3.1 Contractor Responsibilities Review of Requirement: The contractor is required to: 1. Establish and maintain a system which assures that all supplies and services offered for acceptance are subjected to all of the examinations and tests needed to assure conformance to contract requirements. 2. Provide for the inspection of both those supplies and services produced at contractor’s own plant and those purchased from subcontractors or vendors. Contractor may elect to perform the required inspections himself or arrange for someone else to perform the inspections. 3. Document contractor’s inspection system to the extent necessary to assure satisfactory operation. 4. Permit the Government representative to review the inspection system at any time during the life of the contact. 5. Notify the Government representative in writing when any changes are made to the inspection system. All or any part of a contractor’s inspection system may be disapproved by the Government when the system does not accomplish its objectives. CRITERIA FOR EVALUATION 3.1 Contractor Responsibilities Procedures / Date Adequacy Compliance Yes No Yes No 1. Does the inspection system cover all supplies and services offered to the government for acceptance? 2. Does the inspection system cover all supplies and services procured from subcontractors or vendors? 3. Does the inspection system assure that all supplies and services assure that all supplies and services submitted to the Government for acceptance conform to contract requirements? 3.1 Contractor Responsibilities 4. Is the inspection system documented including specific inspection procedures? 5. Are all contractor and supplier tests and inspections documented? 6. Is all documentation available to the Government representative for review? 7. Does the contractor notify the Government in writing of all changes to the system? 8. Does the contract

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档