网站大量收购独家精品文档,联系QQ:2885784924

PIR的Consumption和Reduction.doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
基本概念:PIR(Planned Independent Requirement)的Consumpiton(消耗)和Reduction(減小)是什麼。前者是MD04中的視覺效果,是動態變化的;後者則是真真正正減小了PIR,增加了提取數量。 The consumption reduces planned independent requirements dynamically, whereas the reduction physically reduces the planning quantity and increases the withdrawal quantity accordingly. SAP Note: 772856 ? 1. Question: What is the difference between planned independent requirement consumption and planned independent requirement reduction ? Answer: The consumption reduces planned independent requirements dynamically, whereas the reduction physically reduces the planning quantity and increases the withdrawal quantity accordingly. For example: You create a planned independent requirement with 100 pieces. This planned independent requirement is consumed against a sales order with 10 pieces. The planning quantity and withdrawal quantity remain the same (see MD63) but the planned independent requirement is displayed in the stock/requirements list (MD04) with the quantity 90. The independent requirements reduction occurs when you post the goods movement, in this case, with the goods issue for the sales order. The planning quantity of the planned independent requirement is reduced to 90 pieces and the withdrawal quantity is increased from 0 to 10 (see MD63). In the stock/requirements list, the planned independent requirement is still displayed with 90 pieces despite the reduced planning quantity because when you post the goods issue, the customer requirement against which the planned independent requirements had been consumed also disappears. 2. Question: Which consumption parameters (Consumption mode/consumption period) are taken into account? Answer: The parameters maintained in the material master (material requirements planning view 3) have the highest priority. If you do not specify a consumption mode, the system uses the consumption parameters from the MRP group that is assigned to the material. If a consumption mode is not specified there, the consu

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档