仪表安装技术要求-英文翻译.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
仪表安装技术要求-英文翻译

TECHNICAL SPECIFICATIONS FOR AUTOMATION INSTRUMENT INSTALLATION WORKS Technical requirements for construction 1.1 Conditions for Instrument Installation 1.1.1 The construction drawings, related technical documents and necessary installation and operation instructions of the instruments are all ready and on hand. 1.1.2 Joint checkup of construction drawings has been made. 2.1.3 Technical preparation such as technical explanation and training has been completed. 2.1.4 The construction site has been made ready for instrumentation works, and construction procedures have been prepared and approved. 2.2 General Specification of Instrument Installation 2.2.1 The instrument installation works must be complied with the construction drawings and the operation instructions of the instruments. The model, specification and quality of the equipment and material must be complied with the Instrument Specifications. 2.2.2 Good cooperation must be made between the instrument construction works and other specialties, such as building, structure, electric, process equipment, piping and so on. 2.2.3 Among the instrument installation works, the installation of power supply equipment, laying of electric lines and construction of electric explosion-proofing and grounding works must be complied with the Code for Construction and Acceptance of Industrial Automation and Instrumentation Engineering (GBJ 93-86) and Standard for Quality Inspection and Assessment of Automation Instrument Installation Works (GBJ131-90). 2.2.4 The welding of the instrument installation works must be complied with CM-QC-TR-009 Code for the Field Welding of Equipment and Industrial Piping. 2.2.5 The purging of the air supply system, cleaning of liquid supply system, cutting method of the pipeline, and processing of high-pressure screw thread and sealing surface for threaded flange connection as well as connection of piping must be complied with the specification in the

文档评论(0)

xcs88858 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档