outwitv.以机智取胜(outwit机智机智超出别人).docVIP

outwitv.以机智取胜(outwit机智机智超出别人).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
outwitv.以机智取胜(outwit机智机智超出别人)

System.The No.1~5 building 3 F is as follows directly supplied water by municipal services tube net, the 3 F is above supplied water by house noodles water tank, The ground floor establishes fire fight pond and life pond. Electricity system:The electricity system mainly includes to change to go together with electricity, power to go together with electricity, lighting to go together with an electricity and keep thunder from connecting The ground, fire fight reports to the police and weak electricity etc. system.Among them, the weak electricity system mainly includes:The structure turns cloth line system, Anne defends system and broadcast system, LED monitor and garage one cartoon system and television system. Well ventilated system:Mainly include the fire fight row smoke system, ground floor garage person to defend well ventilated system. Air condition system:the refrigeration engine room establish in the No.4 building ground floor, machine set adoption water cold Luo pole type air condition cold water The machine set is 2 sets, three cold x-rated leave heart of air condition cold water machine set 2 sets and fuel central hot water machine the set is 4 sets.Do The way that the male room adopts the breeze machine dish tube to add new breeze. Elevator:The No.1 building totally establishes 6 day from Guangzhou of sets to sign one NPX-1000-C90 type elevator. 7 Three, the construction prepare (A)Prepare on the scene 1.the construction place is neat Construction place already from construction the unit is basic and neat, start construction the temporary passage as the C10 concrete road noodles. 2.the construction use water at the time on the scene (1)This engineering construction is presently used water headwaters the city in the east side to supply water to take care of a net.Consideration originally engineering lord To use the factor that the spot pump sends concrete therefore, deciding that this engineering construction is used water lord trunk line tube BE DN100, the

文档评论(0)

xcs88858 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档