盖板涵施工日志(英文版).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
盖板涵施工日志(英文版)

XXXXXXGAUGE RAILWAY PROJECT CONSTRUCTION LOG Section: No 1 Project: XXXXX Standard Gauge Railway Kilometrage: DK29+513.9 Construction Unit: Culvert Date of Commencement: 09/11/2014 Date of Completion: (Part of ) Construction Log Page of Log Remarks Date: 09/11/2014 Weather: Sunny Temperature:24 CONSTRUCTION CONTENT Setting the control points to the area to receive culvert Excavation of the cutting area to the required depth receive culvert base Dumping of the excavated soil by use of dumping trucks VEHICLE/MACHINERYUSED Excavator-1 Dumping trucks 3 Wheel Loader-1 4. Dumpy Level - 1 WORKFORCE Engineers-2 Operators -2 Drivers – 3 Recorder: Steve Mbanza Construction Log Page of Log Remarks Date: 10/11/2014 Weather: Sunny Temperature: CONSTRUCTION CONTENT Excavation of the cutting area to the required depth receive culvert base Dumping of the excavated soil by use of dumping trucks VEHICLE/MACHINERYUSED Excavator-1 Dumping trucks- 3 Wheel Loader-1 Dumpy level - 1 WORKFORCE 1.Engineers-2 2.Operators -2 Drivers – 3 Laborers - 5 Recorder: Steve Mbanza Construction Log Page of Log Remarks Date: 11/11/2014 Weather: Sunny Temperature: CONSTRUCTION CONTENT 1. .Excavation of the cutting area to the required depth receive culvert base 2. Creating side slope embankment 1:1 to the sides of the culverts .Dumping of the excavated soil by use of dumping trucks Creating ditches to control surface water to the top of the excavated area VEHICLE/MACHINERYUSED 1 Excavator-1 Dumping trucks 1 WORKFORCE 1.Engineers-2 2.Operators -1 3. Drivers – 1 Laborers- 5 Recorder: Steve Mbanza Construction Log Page of Log Remarks Date: 12/11/2014 Weather: Sunny Temperature: CONSTRUCTION CONTENT 1. Leveling the bottom and the sides of th

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档