盖板涵施工日志(英文版)
XXXXXXGAUGE RAILWAY PROJECT
CONSTRUCTION LOG
Section: No 1
Project: XXXXX Standard Gauge Railway
Kilometrage: DK29+513.9
Construction Unit: Culvert
Date of Commencement: 09/11/2014
Date of Completion:
(Part of )
Construction Log
Page of
Log Remarks
Date: 09/11/2014 Weather: Sunny Temperature:24
CONSTRUCTION CONTENT
Setting the control points to the area to receive culvert
Excavation of the cutting area to the required depth receive culvert base
Dumping of the excavated soil by use of dumping trucks
VEHICLE/MACHINERYUSED
Excavator-1
Dumping trucks 3
Wheel Loader-1
4. Dumpy Level - 1
WORKFORCE
Engineers-2
Operators -2
Drivers – 3
Recorder: Steve Mbanza
Construction Log
Page of
Log Remarks
Date: 10/11/2014 Weather: Sunny Temperature:
CONSTRUCTION CONTENT
Excavation of the cutting area to the required depth receive culvert base
Dumping of the excavated soil by use of dumping trucks
VEHICLE/MACHINERYUSED
Excavator-1
Dumping trucks- 3
Wheel Loader-1
Dumpy level - 1
WORKFORCE
1.Engineers-2
2.Operators -2
Drivers – 3
Laborers - 5
Recorder: Steve Mbanza
Construction Log
Page of
Log Remarks
Date: 11/11/2014 Weather: Sunny Temperature:
CONSTRUCTION CONTENT
1. .Excavation of the cutting area to the required depth receive culvert base
2. Creating side slope embankment 1:1 to the sides of the culverts
.Dumping of the excavated soil by use of dumping trucks
Creating ditches to control surface water to the top of the excavated area
VEHICLE/MACHINERYUSED
1 Excavator-1
Dumping trucks 1
WORKFORCE
1.Engineers-2
2.Operators -1
3. Drivers – 1
Laborers- 5
Recorder: Steve Mbanza
Construction Log
Page of
Log Remarks
Date: 12/11/2014 Weather: Sunny Temperature:
CONSTRUCTION CONTENT
1. Leveling the bottom and the sides of th