某著名设计公司的高尔夫球场施工规范.doc

某著名设计公司的高尔夫球场施工规范.doc

  1. 1、本文档共42页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
某著名设计公司的高尔夫球场施工规范

TECHNICAL SPECIFICATIONS INDEX No. of Pages TURFGRASS NURSERY CONSTRUCTION 2 GOLF COURSE SURVEY STAKING AND LAYOUT 6 PART2-PRODUCT AND EXECUTION 6 CLEARING AND GRUBBING 8 GOLF COURSE ROUGH GRADING 11 GOLF COURSE FINE GRADING 16 GOLF COURSE FINE GRADING 16 GOLF COURSE TEEING AREA CONSTRUCTION 21 GOLF COURSE PUTTING GREEN CONSTRUCTION 26 GOLF COURSE SAND BUNKER CONSTRUCTION 34 GOLF COURSE SEEDBED PREPARATION AND PLANTING 38 TURFGRASS NURSERY CONSTRUCTION PART 1 – GENERAL Conditions: Requirements of the General Conditions are a part of and apply to all the work of this Section. Work Included: There are no construction drawings for this section Scope of this Specification shall be the preparation of the site including clearing and grubbing procurement, transportation, and delivery of stolons; preparation for planting including soil tests, provision of seedbed mix, and temporary water system; planting of the stolons; fertilization, and maintenance of the area. The area shall consist of a total of 5 ha (5000㎡) or 12.35 acres divided into two areas: one/half ha (1.25 acres) for the growth of certified Tifway 419 Hybrid Bermudagrass/Greenlees Park bermudagrass. Related Work: Clean-up: The Contractor(s) shall be responsible for full clean-up of the site on a continuing basis. The Contractor(s) shall provide receptacles for debris and rubbish and be responsible for hauling and disposing off-site in a manner acceptable to the Project Manager. Upon completion of all work under the Contract, the Contractor will be responsible for final clean-up of the project work surface to be cleaned as determined by the Project Manager. All debris shall be disposed of a sites or in methods approved in advance by the Project Manager. Irrigation: Contractor shall supply a temporary irrigation system to the nursery area. The source of water to be used shall be in ample supply and be available on a dependable basis. Quality Assurance: Substitutions: No substitutions are allowed in this sec

文档评论(0)

pangzilva + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档