- 1、本文档共118页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
年产量为240mta设计井田
内容摘要
祁东井田位于安徽省宿州市东南约二十公里处,行政区划由宿州市祁县和西寺区以及固镇县的湖沟区管辖. 9km ,南北宽3.5~5km,面积近45km2
+17.02~+22.89m左右,一般在+21.00m,井田西北、东北地势略比东南高。10公里,为常年流水河流,据1984年测最高洪水位达+20.75m,本矿井为煤与瓦斯突出矿井.
240mt/a,矿井工作日为300d,每天三班作业,其中两班生产,一班检修,为8小时工作制.预计矿井服务年限为70.4年.工业广场内设计3个井筒,分别为主井,副井和风井.
2个水平,一水平为-600,二水平为-800,采用走向长壁采煤法,通风方式采用中央并列式,井底车场为立式井底车场Well farmland Locate Southeast about 20Kilometer of suzhou city,anhui Province. Administrative area from qing County of suzhou city and West temple District and Lake ditch District of guzhen county.The whole Well farmland east west about 9 Kilometer, South north abou 3.5km-5km, Area about 45km2.
This well farmland Ground Central part of huaibei Plain, Geography flatness Ground Elevation about +17.02~+22.89m, General +21.00m. Well farmland northwest. nrtheast geography high in Southeast. The subsidiary current inside the area is numerous, Artificial outlet, the ater department fly to all from northwest to southeast.Hui River is Main river of the well farmland, flow through this well farmland about 10 kilometers, for often year flowing water river. Measure the tallest flood to reach +20.75 m according to 1984, this mineral well is an outstanding mineral well of coal and gases.
The yield of year of a design well farmland is 240 mt/a, The mineral well workday is 300d, Three classes of homeworks of everyday, Among them, Two the classes produce, a class of check fix, work to make for 8 hours. Anticipate the mineral well service time limit is 70.4 year. The industry square inside design 3 well tubes, is a main well respectively, vice- well moderate breezes well.
This design well farmland work rows to is divided into two Level,the frist is –600m,the second is –800m. adopt the alignment the long wall adopts the coal method, the well ventilated way adopts the central be juxtaposed type, the well bottom car field for sign type well bottom car field.
Key Word:Alignment long wall, Central be juxtaposed type
前 言
依靠现在科学技术的进步,不断提高经济效益,贯彻安全生产原则,是实现煤炭工业现代化的根本途径
您可能关注的文档
- 定时LCD闹钟设计.doc
- 宜昌某石墨矿地下开采设计.doc
- 宝塔石化股份有限公司人才招聘现状问题及趋势研究.doc
- 宝射河水环境整治工程施工组织设计.doc
- 实物期权下二叉树模型在山东黄金企业价值评估中的运用研究.doc
- 实用家庭智能化方案.doc
- 实训论文-简易5号7号电池充电器.doc
- 审计学审计风险以及防范对策研究.doc
- 客厅沙发情感化设计.doc
- 客用电梯的控制系统设计.doc
- 第18讲 第17课 西晋的短暂统一和北方各族的内迁.docx
- 第15讲 第14课 沟通中外文明的“丝绸之路”.docx
- 第13课时 中东 欧洲西部.doc
- 第17讲 第16 课三国鼎立.docx
- 第17讲 第16课 三国鼎立 带解析.docx
- 2024_2025年新教材高中历史课时检测9近代西方的法律与教化含解析新人教版选择性必修1.doc
- 2024_2025学年高二数学下学期期末备考试卷文含解析.docx
- 山西版2024高考政治一轮复习第二单元生产劳动与经营第5课时企业与劳动者教案.docx
- 第16讲 第15课 两汉的科技和文化 带解析.docx
- 第13课 宋元时期的科技与中外交通.docx
文档评论(0)