- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
[土木交通类] 州际710长滩段(CA)周末关闭交通55小时,快速施工修复沥青混凝土路面 土木类 文献及翻译
本科毕业设计
英文翻译
年 级:
学 号:
姓 名:
专 业:道路工程
指导老师:
2009年6月
原文
Fast-Track Asphalt Concrete Pavement Rehabilitation
on I-710 Long Beach (CA) during 55-hour Weekend Closures
By
Eul-Bum Lee
Assistant Research Engineer
Pavement Research Center
Institute of Transportation Studies
University of California, Berkeley
1353 S. 46th Street, Bldg. 480
Richmond, CA 94804
v: 510-231-5693
f: 510-231-9589
eblee@
John T. Harvey
Associate Professor
Department of Civil and Environmental Engineering
University of California, Davis
Engineering III, Room 3139
One Shields Avenue
Davis, CA 95616
v: 530-754-6409
f: 510-231-9589
jtharvey@
Hojung Lee
Graduate Student Researcher
Department of Civil and Environmental Engineering
University of California, Berkeley
215 McLaughlin Hall Berkeley, CA 94720 v: 510-282-3082
f: 831-308-7074
hoj2@
Carl L. Monismith
Professor
Department of Civil and Environmental Engineering
University of California, Berkeley
115 McLaughlin Hall
Berkeley, CA 94720
v: 510-642-9067
f: 510-643-8919
clm@
Paper No. 04-3156
Word Count: 6,000 + 3 Figures and 2 Tables = 7,500
Paper offered for the 2004 annual meeting of the Transportation Research Board Annual Meeting
Washington, D.C., January ####
ABSTRACT:
This paper presents construction data and analysis of the first large-scale long-life asphalt concrete (AC) pavement rehabilitation project in California, where a fast-track construction scheme of 55-hour weekend closures was successfully implemented to rehabilitate a 4.4-km stretch of Interstate 710 in Long Beach. The project proved that a pavement designed to provide a 30-year design life can be constructed in a series of weekend closures, even in the most heavily truck loaded route in the state. The project included four full-depth AC replacement sections (1.6 km in total), located under freeway overpasses, where the existing concrete pavement was removed and replaced with AC. The remaining sections (2.8 km in total) wer
您可能关注的文档
最近下载
- 黄芪商品规格等级标准.doc VIP
- 光伏项目地质灾害危险性评估报告(内审稿).docx
- 基于毫米波的工业5G创新应用白皮书(2024)v2.1.pdf VIP
- 工程有限公司叉车安全风险分级管控清单.docx VIP
- 配送人员组织架构及分工职责描述.docx VIP
- T∕CACM 1021.6-2018 中药材商品规格等级 甘草.docx VIP
- DBJ61_T 186-2021 二次供水工程技术规程.pdf
- (2025秋新版)人教版三年级数学上册《第三单元 毫米、分米和千米》PPT课件.pptx
- 注册会计师财务成本管理《本量利分析微信做题》模拟练习卷.doc VIP
- 呼吸系统感染的防控和护理要点PPT.pptx VIP
文档评论(0)