网站大量收购独家精品文档,联系QQ:2885784924

交安中英文对照.doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
交安中英文对照

马来西亚日产5000吨“海峡”水泥厂 基础交安条件 Foundation Delivery and Installation Conditions of Malaysia 5000tpd Straits Cement Plant 一、所有需要交安的土建基础必须具备三通一平的条件,即水通、电通、路通和场地平整。 All the civil engineering foundations which need delivery and installation must be equipped with the condition of “three supplies and one leveling”, which means supply of water, electricity and road and leveled ground. 1、水通、电通:熟料线现场施工用水、用电均由业主从一期水泥厂提供接入口。 1.Supply of water, electricity: the owner should create an access entry for water and electricity from 1st-phase cement plant to on-spot clinker line. 2、路通:需交安基础必须具备道路通畅的条件,即从厂区大门至交安基础具备路通的条件,并能承受重型车辆的通行。 2. Supply of road: the foundations must be equipped with smooth road, namely from the plant gate to delivery and installation foundations, and it should bear the heavy vehicles. 3、场地平整:需交安基础附近必须具备堆放设备等材料的场地,具体场地条件因为需交安基础的特点不同由安装单位和土建单位协商确定。 3. Leveled ground: near the delivery and installation foundations, there must be a ground for equipments. The detailed site conditions should be determined according to the features of delivery and installation foundations by the installation entities and civil engineering entities. 二、基础验收工作的内容,包括以下各项: The details of foundation receipt work, including: 1、预埋螺栓外露部分需保持整洁、无腐蚀情况,预埋螺栓孔应干净。 1.The exposed part of the embedded bolt should be clean and without corrosion. The hole of the embedded bolt should also be clean. 2、基础砼强度需要达到设计要求的100%强度。 2.The intensity of the foundation concrete should be 100% according to the designation. 3、需进行二次灌浆的基础部位,基础表面必须由土建单位凿毛并保证界面清洁。 3.The foundation surface of the foundation part, needing re-grout, should be chiseled until it becomes rough by the civil engineering entities and it should be clean. 4、交安前交安区域内的垃圾应由土建单位清除。 4.Before delivery and installation, the garbage there should be removed by the civil engineering entities. 5、具体的交安部位主要验收项目及标准见附件3。该附件3外的验收项目以相关英标要求为准。 5.The main acceptance items and standards of specific delivery and installation are all in attachment 3. Other acceptance items sho

文档评论(0)

173****7830 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档