Scientific Report on Tamar Siltation英文资料.pdfVIP

Scientific Report on Tamar Siltation英文资料.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
South Esk – Great Lake Water Management Review Scientific Report on Tamar Siltation August 2003 Prepared by Hydro Tasmania Table of Contents 1. Assessment of Issues and Status 1 2. Formulation of Study Objectives 10 3. Data Collection and Analysis11 4. Management Options for Tamar Siltation Issue 12 Scientific Report on Tamar Siltation August 2003 TAMAR SILTATION 1. ASSESSMENT OF ISSUES AND STATUS Siltation in the Upper Tamar River Following the public consultation phase of the South Esk – Great Lake Water Management Review, comment was received that sedimentation in the Upper Tamar Estuary was an issue that should be considered during the Technical Studies stage of the Water Management Review, and that operation of the Trevallyn Power Station should be examined as a possible method of reducing dredging activities in the area. This issue was canvassed in the mid-1980s during a comprehensive scientific study of sedimentation in the Tamar River (WRL, 1986ab). Siltation of the upper Tamar River has long been an issue for use of this waterway, and dredging activities have been undertaken there since as early as 1859. The Upper Tamar River Improvement Authority, a body that comprises members of Launceston City Council, West Tamar Council, the Port of Launceston, the Tasmanian State Government and a number of other community members, currently supervises dredging. The principal objective of Upper Tamar River Improvement Authority is to provide river dredging for flood protection, recreational amenity, commercial activities and general navigation in the upper reaches of the Tamar River from the northern point of Tamar I

文档评论(0)

网游加速器 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档