招标文件-Scope of Work 工作范围3
EXHIBIT B
SCOPE OF WORK
OF
CONSTRUCTION CONTRACT ENQUIRY
FOR
Xx
XX, XX, CHINA
AUG, 2009
TABLE OF CONTENTS
INTRODUCTION
DEFINITION AND ABBREVIATION
PLANT DIVISION
SCOPE OF WORK
General
Contractor Work Scope
Purchaser Scope
Code, Standard And Specification
Period Of Work
Material Procurement
Contractor Site Responsibilities
Civil Work
Instrument Installation
4.10 Electrical Installation Cabling Work
4.11 Preparation For Commission
4.12 Leak Test
4.13 Insulation Work
4.14 Yard Area Equipment Installation
4.15 Yard Area Pipe/Mechanical Installation
4.16 Yard Area Instrumentation Installation
4.17 Yard Area Electrical Installation
4.18 Painting Work
4.19 Insulation And Heat Tracing Work
4.20 HVAC Water Supply And Drainage
4.21 Miscellaneous Work
COMPLETION AND TESTING
ENGINEEIRNG AUDIT
PURCHASER DOCUMENTS
CONTRACTOR DOCUMENTATION
SUB-CONTRACTOR
BIDDING DOCUMENTS TECHNICAL REQUIREMENT
Appendix A to Exhibit B – AP Supply List (5 pages)
Appendix B to Exhibit B – Supports List (16 pages)
INTRODUCTION
Xx (hereinafter called Purchaser) will build an Nitrogen generation plant (hereinafter called Plant), along with a suite of backup system on site of XX ELECTRONIC Xx Co.,Ltd (hereinafter called Customer), located in Chenjiang Town, Xx City, Xx, China. The plant consists of a number of separate units which to be delivered to site, off-loaded, erected, bolted down and connected together with interconnection pipes and cabling prior to commissioning and start-up. Please refer to attached plant General Plot Plan for the overview of Plant.
In general, this document defines the material and service (hereinafter called Work) to be procured for the erection of the Plant, as well as the procedures and specifications required to be followed up in the Work.
For the fully understanding of the job description and scope of work, all the drawings and standard specifications shall be read in conjunction with this document. These a
您可能关注的文档
- 成都市岚雨园林绿化有限公司绿化工程投标书(可编辑).doc
- 成果1:降低灰库湿式双轴搅拌器故障率.doc
- 成都市方联高级中学校园网设计方案(二等奖作品).ppt.ppt
- 成都某电子厂安装工程施工组织设计4、7号厂房工程电气、给排水施工组织设计(正).doc
- 成都城南桐梓林地铁城市综合体广告推广提案80p.ppt
- 成都温江友兴欧香小镇全案营销思路提案_101PPT.ppt
- 成都琴台路原3508厂地块项目发展预判报告.ppt
- 成都置信集团物业板块薪酬管理制度_[全文].doc
- 成都驾校理论考试技巧一(附交通标志图标大全).doc
- 我国房地产市场供求关系分析(网络营销手册wwwtomxcom.doc
文档评论(0)