金汇广场现场施组设计
目录
第一篇 工程施工目标····························5
1.质量目标······································5
2.进度目标······································5
3.安全文明施工目标······························5
第二篇 工程概况································6
1.工程性质·····································6
2.工程地理位置及周围环境·······················6
3.建筑工程简况·································6
第三篇 施工准备································7
1.现场平面布置·································7-13
2.施工人员准备·································7-13
3.施工机械准备·································7-13
4.施工物资准备·································7-13
5.施工技术准备·································7-13
第四篇 主要施工技术措施························14
1.施工部署·····································14-56
2.施工流程·····································14-56
3.施工测量定位及轴线标高控制方法及技术措施·····14-56
4.打桩施工工艺要点·····························14-56
5.基础施工技术措施·····························14-56
6.上部结构工程施工技术措施·····················14-56
7.安装工程施工技术措施·························14-56
8.沉降观测计划·································14-56
9.季节性施工技术措施···························14-56
第五篇 特殊工程或工序施工技术方案··············57
1 外墙防渗漏措施····························57-60
1.1外墙砌筑措施······························57-60
1.2外墙粉刷措施·······························57-60
1.3结构增强措施·······························57-60
2厕所间、穿楼板管道防渗漏措施·················57-60
2.1结构施工防渗漏措施·························57-60
2.2预留洞的补筑及防水措施·····················57-60
3屋面防渗漏措施·······························57-60
3.1结构施工防渗漏措施·························57-60
3.2穿屋面的管道及出气孔的补筑·················57-60
3.3防水层的施工·······························57-60
第六篇项目施工主承包管理组织机构和技术力量配备·61
1.项目承包技术力量配备原则····················61-65
2.管理人员配备的情况··························61-65
3.现场管理体制和管理人员配置计划··············61-65
4.项目施工技术工人配备情况····················61-65
第七篇 施工进度计划···························66
1.确保总进度计划实施的措施····················66-71
2.劳动力配置计划······························66-71
3.施工工程进度计划····························66-71
第八篇 质量、安全及文明施工保证措施···········71
1.质量保证措施及质量保证体系···················71-95
2.项目