- 1、本文档共163页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
TITLE 46 —?SHIPPING [ 46 CFR ]PART 162 — ENGINEERING EQUIPMENT [ 46 CFR 162 ]Note:?— Current as of: 09/27/2012, Updated weekly.— Enhanced with links to US Code, FR and CFR References where ever possible and more to come.— You can embed the URL to this page in your documents to access the current CFR part.?— This consolidated CFR Part was last updated by Federal Register(FR) dated 06/08/2012 for?§ 162.060-22;?/46cfr162.aspx§ 162.060-42; .able of Contents/46cfr162.aspxSubpart 162 — .017—General Provisions; Valves, Pressure-Vacuum Relief, for Tank Vessels?[ Last FR update*: 03/25/1950 ]/46cfr162.aspx§ 162.017-1 — Preemptive effect; incorporation by reference.?[ Last FR update*: 06/07/2012 ]/46cfr162.aspx§ 162.017-2 — Type.?[ Last FR update*: 07/29/1991 ]/46cfr162.aspx§ 162.017-3 — Materials, construction, and workmanship.?[ Last FR update*: 10/31/2008 ]/46cfr162.aspx§ 162.017-4 — Inspections and testing.?[ Last FR update*: 07/29/1991 ]/46cfr162.aspx§ 162.017-5 — Marking.?[ Last FR update*: 09/21/2001 ]/46cfr162.aspx§ 162.017-6 — Procedure for approval.?[ Last FR update*: 09/25/2009 ]/46cfr162.aspxSubpart 162 — .018—Safety Relief Valves, Liquefied Compressed Gas?[ Last FR update*: 03/25/1950 ]/46cfr162.aspx§ 162.018-1 — Applicable specifications, and referenced material.?[ Last FR update*: 12/18/1968 ]/46cfr162.aspx§ 162.018-2 — Scope.?[ Last FR update*: 10/18/1952 ]/46cfr162.aspx§ 162.018-3 — Materials.?[ Last FR update*: 06/29/1973 ]/46cfr162.aspx§ 162.018-4 — Construction and workmanship.?[ Last FR update*: 10/18/1952 ]/46cfr162.aspx§ 162.018-5 — Blow-down adjustment and popping tolerance.?[ Last FR update*: 10/18/1952 ]/46cfr162.aspx§ 162.018-6 — Marking.?[ Last FR update*: 09/21/2001 ]/46cfr162.aspx§ 162.018-7 — Flow rating tests.?[ Last FR update*: 09/21/2001 ]/46cfr162.aspx§ 162.018-8 — Procedure for approval.?[ Last FR update*: 09/25/2009 ]/46cfr162.aspxSubpart 162 — .027—Combination Solid Stream and Water Spray Firehose Nozzles?[ Last FR update*: 05/23/1996 ]/4
文档评论(0)