- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
福特培训资料5-长安福特变速箱控制系统
长安福特 Initial position A Operated B Fluid pump pressure 1 Drain hole to fluid sump 2 Main line pressure 3 Throttle pressure 4 Preload pressure 5 Initial position A Operated B Main line pressure 1 Preload pressure 2 Drain hole to fluid sump 3 Initial position A Operated B Preload pressure 1 Throttle pressure 2 Drain hole to fluid sump 3 Main regulating pressure 4 Initial position A Operated B Main line pressure 1 Accumulator control pressure A 2 Main regulating pressure 3 Drain hole to fluid sump 4 Initial position A Operated B Main line pressure 1 Accumulator control pressure B 2 Control pressure of the PWM solenoid valve forthe 2nd/4th/5th gear brake3 Drain hole to fluid sump 4 Initial position A Operated B Main line pressure 1 Accumulator control pressure C 2 Control pressure of the PWM solenoid valve for the 3rd - 5th gear clutch 3 Drain hole to fluid sump 4 Initial position A Operated B Main line pressure 1 Converter pressure 2 Drain hole to fluid sump 3 Initial position A Operated B Main line pressure 1 Reduced actuation pressure, 1st - 3rd gear clutch 2 Main regulating pressure 3 Drain hole to fluid sump 4 Initial position A Operated B Main line pressure 1 Reduction brake band pressure 2 Accumulator control pressure B 3 Drain hole to fluid sump 4 Initial position A Operated B Main line pressure 1 Drain hole to fluid sump 2 Initial position A Operated B Converter pressure 1 Pressure in the lubricant circuit 2 Control pressure of the TCC PWM solenoid valve 3 Drain hole to fluid sump 4 Initial position A Operated B Main line pressure 1 To the 2nd/4th/5th gear brake 2 To the 5th gear clutch 3 Drain hole to fluid sump 4 Reduction brake pressure 5 To shift valve C (L17) 6 To shift valve B (L5) 7 To the 3rd - 5th gear clutch 8 Preload pressure from SSA 9 Initial position A Operated B Main line pressure 1 To shift valve A (L7) and shift valve C (L17) 2 From shift valve A (L7) 3 To reduction pressure control valve (L18) 4 Drain hole to fluid sump 5 From shift valve C (L
您可能关注的文档
最近下载
- 冀教版八年级下册数学全册教案.docx
- 壮锦论文开题报告范文.docx VIP
- 血管导管使用指征、置管方法、使用与维护.pptx
- DL∕T 401-2017 高压电缆选用导则.docx VIP
- 外研版Unit 2 Presenting ideas课件- 2024-2025学年英语七年级上册.pptx VIP
- 2024年河南省中考语文试卷及答案.pdf VIP
- 最新七年级数学一元一次方程应用题复习题及答案20487_图文 .pdf VIP
- 大笑毕业记的搞笑小品剧本.docx
- 2024-2025学年高二数学上学期期末考试试卷.docx
- CAAC无人机理论考试题库资料及答案(2025修订版)附答案(培优).docx VIP
文档评论(0)