- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
路基路面课程设计毕业论文含英文版参考
Course ProjectRoad Pavement EngineeringHighway School of Chang’an University XXXAdvisor:XXX2016-xx-xxPart I Data CollectionThe project is segment A of Shijiazhuang to Zhengzhou grade 1 highway. Climate dataNatural Zone: II4Annual Rainfall: 570mm; HT: 37C; LT: -7C Frost-thaw: Max frozen depth of 60cm; Frozen index of 1023C on average and 1540C in Max Geological and subgrade conditionsSoil Type: alluvial soil(as clay soilsof low liquid limit)Embankment: 0.6m of height;Water table: 2.7m from the roadbed surface in mid-wet state;Subgrade width: 24.5m=4*3.75+2*2.5(Hard shoulder)+2*0.75(soil shoulder)+3.0(central median)Traffic dataTable 1. Traffic combinationNO.ClassificationVehicle modelsDaily traffic flow(veh/d)Vehicle conversion coefficient1Medium sizeMitsubishiT653B 3201.52Medium sizeJieFang CA390 2201.53Large sizeJACHarge sizeCNHTCJrailerXJ HQP4014036TrailerDFM EQ155903Note: NO. 5 6 is vision traffic, only considered in the calculation of the pavement structure.PartII Asphalt Pavement Design1.1 Traffic AnalysisESALs calculation Specific calculating process is in excel, and applied equations are:Deflection and asphalt layer bottom tensile stress as design criteria Tensile stress at the bottom of semi-rigid base as design criteria Accumulative equivalent ESALsIncreasing ratio for every five years areγ1=8%,γ2=7%, γ3=5% so the total increasing ratio G can be calculated as:G1= [(1+8%)5-1]/ 8%=5.87 G2= (1+8%)5*[(1+7%)5-1]/ 7%=8.45G3= (1+8%)5*(1+7%)5*[(1+5%)5-1]/ 5%=11.39G=G1+G2+G2=25.71According to specification for design of highway asphalt pavement clause 3.1.7, Ne= Ne1 =365*8534*25.71*0.5=40.04msa(Deflection and asphalt layer bottom tensile stress as design criteria)Ne2=365*82980*25.71*0.5=389.3msa(Tensile stress at the bottom of semi-rigid base as design criteria)1.2Subgrade ModulusFrom the table 5.1.4-1 in JTG D50-2006, consistency is between 0.95-1.10, the corresponding MR is less than 40 MPa and for extre
您可能关注的文档
最近下载
- 钢筋加工区作业指导书.pptx
- 新人培训 -药品.pptx VIP
- 我是整理大王小学二年级下册综合实践活动PPT课件.pptx VIP
- NB_T 10512-2021《水电工程边坡设计规范》.docx VIP
- 《喷气涡流纺值车工操作规程》.pdf VIP
- (高清版)DB13∕T 1825-2013 《地面辐射供暖供冷与新风系统技术规程》.pdf VIP
- 2024^2025学年北京市海淀区九年级上册期中物理试题 [含参考答案].pdf VIP
- 化工企业安全考试精品题库含精品答案.docx VIP
- 金属非金属矿山主要负责人和安全生产管理人员培训.pdf
- 基坑工程风险辨识及防范措施.docx VIP
原创力文档


文档评论(0)