- 1、本文档共18页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Multi Echelon Techniques in Optimal Inventory Modeling of 在最优库存模型的多级技术
Multi Echelon Techniques in Optimal Inventory Modeling of Systems with Repairable Items Presented by Nuriye Kaptanlar 14/05/2003 Repairable Spares Optimization What is Spares Optimization? - At the core of supply chain management - Aimed at determining the best* answers to - How many spares should we buy? - Where should we put them? * Best is satisfying a performance goal for the lowest cost. Why to hold spare inventory? In general - To attain a certain level of end-item (i.e. aircraft) availability, in order to be able to continue the daily operations. Since spare parts are too expensive, -the reduction in the amount of inventory kept for them while achieving the desired operational availability would cause significant savings -managing spare parts’ inventory effectively would enable to achieve a higher operational availability with the same amount of investment. What has been done? Has been researched since late 60s MODMETRIC United States Air Force Logistics Command Manugistics, I2, TFD The software Vari-METRIC Turkish Air Force Project: - SAP R/3 + APO + Vari-METRIC - to achieve desired operational availability levels of different aircraft types Characterization Operational versus support sites Single versus multiple echelons Divergent versus convergent systems Acyclic versus cyclic models Condemnations allowed versus conservative systems Deterministic versus stochastic demand Item based versus multi indenture structure METRIC METRIC Assumptions Demand for each item ~ Compound Poisson Demand is stationary over the prediction period Demand on where repair is to be accomplished depends on the complexity of the repair only. Lateral resupply is ignored System is conservative (no condemnation) METRIC is used for Optimization: Determining optimal base-depot stock levels for each item Redistribution: Allocating the stock between the bases and depot Evaluation: Providing an assessment of the performance and investment cost for the system of
您可能关注的文档
最近下载
- (完整word版)人教版四年级上册数学复习教案.doc VIP
- 煤矿安全操作规程(2023年).docx
- 工作相关肌肉骨骼疾患的工效学预防指南 第 4 部分 轨道交通设备制造作业.pdf VIP
- 园林景观工程施工计划.pdf
- OC IIS的定义(液晶玻璃的检验与不良判定).ppt VIP
- 2025届高考语文复习:文言文阅读+课件.pptx VIP
- 大班数学《坐船去探险》教案课件材料.doc VIP
- 工作相关肌肉骨骼疾患的工效学预防指南 第 6 部分 木质家具制造作业.pdf VIP
- 初中英语八年级上册首字母填空专项练习(共100题,附参考答案).doc
- 工作相关肌肉骨骼疾患的工效学预防指南 第 9 部分 公交车驾驶作业.pdf VIP
文档评论(0)