煤矿工作面瓦斯治理措施及问题分析【煤矿专业毕业设计论文】.docVIP

煤矿工作面瓦斯治理措施及问题分析【煤矿专业毕业设计论文】.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
河南 * * 学院 毕业设计(论文) 题目:平煤八矿己1617-23100工作面瓦斯治理措施及问题分析 姓   名 系 别、 专 业 导 师 姓 名、职 称 完 成 时 间 Oneself 1617-23100 working surface gas government measure and problemanalysis Abstract: Pingdingshan coal industry group four ores are a large-scalemodernized mine pit, goes into production from 58 years first, themine pit productivity already from at first 600,000 tons/years, raisesthe present 2.81 million tons/year levels. Extends along with the minepit unceasing development, mine pit natural condition and miningengineering factor also in unceasing occurrence change. The damp ranktransforms from the low gas mine pit into the high gas mine pit, hastwo to 2002 to pick the area to locate prominently picks the area,this ore is decided as the prominent mine pit. I tracked investigatehad the prominent dangerous the oneself 1617-23100 working surface gassituation. The collection tunneling period gas material and guardsagainst suddenly the technical measure and returns picks the periodgas government measure, and earnestly studied has pulled out puts thecraft. Through the data analysis earnest summary, summarized thisworking surface tunneling period gas to gush out the situation and afour body guards against suddenly the measure, returned to picks theperiod gas the origin and the government situation, pulled out thiscoal bed gas in advance including the overlapping drill hole law, on the gas government, the working surface hits the shallow holerelease gas. And the basis the knowledge which studied in these threeyears discovers the question which this working surface in the gaspreventing and controlling measure implementation process existed andhas carried on the analysis, proposed own opinion, will have thesimilar problem for future this ore to provide a technical guidance This ore to existing pulled out in the original foundation putsthe system to carry on the optimized transformation already to becomethe most urgent problem, this graduation

您可能关注的文档

文档评论(0)

万有引力 + 关注
实名认证
文档贡献者

收集网上资源

1亿VIP精品文档

相关文档