预防卡钻及提高排阻成功率之研究
預防卡鑽及提高排阻成功率之研究*
*
A study of stuck pipe prevention and enhanced free pipe technology
1 2
1 2
W.L. Wang M.C. Lee
Dr ill pip e may get stuck in the borehole for
several reasons: part of the borehole collapsing on to
the drill pipe; high angle dogleg; or high borehole/
formation pressure differential.
Th e most com mon r ea son for th e b or ehole
collap sing on t o th e p ip e i s th at th e for m at ion
interstitial salt water forming a bond with the water
in the dr illing mud . Th is can cau se the sh ale to
U exp and and slough off into the b orehole cau sing
Pipe-lax stuck pipe.
The drill pipe can also get stuck in the borehole
when b orehole pressure is much higher than the
formation pressure. The high pressure differential
can build up thick mud cake that may cau se stuck
1. 2 . collars during tripping out.
3. If the dr ill pip e get s stuck at a dogleg, it is
probably because the drilling angle deviated slightly
in the drilling process. When the drill stem is pulled
from the hole, the drill pipe or the slightly larger drill
collars get stuck at the dogleg. Since the borehole
is seldom straight, the opportunity for dogleg stuck
pipe is always present.
您可能关注的文档
最近下载
- RB308A-rev1.7-晶准-恒佳盛一级代理.pdf VIP
- 小学奥数 较复杂的乘法原理.pdf VIP
- 2024年陕西省中考数学真题(学生版+解析版).docx
- 小学奥数 加乘法原理.docx VIP
- 2025烟台南山学院单招《数学》复习提分资料(含答案详解).docx VIP
- 湖南省湘一名校2026届高三上学期12月质量检测物理试卷(含答案).pdf VIP
- 2025年上海高考数学二轮复习:热点题型4 统计与概率(六大题型)原卷版+解析.pdf VIP
- WordExcel2010中文版办公专家从入门到精通.pdf VIP
- 新教材人教A版高中数学选择性必修第三册习题答案.docx VIP
- 专题08 古诗鉴赏(解析版)备战2024年中考语文真题题源解密(全国通用.docx VIP
原创力文档

文档评论(0)