- 1、本文档共71页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
水力工程毕业设计--混凝土重力坝_设计计算书【毕业设计(论文)】-好[精品]
水力工程毕业设计--混凝土重力坝_设计计算书【毕业设计(论文)】-好
Abstract
The Lingjiang Hydro-junction Projects are at I level and located on the Lingjiang River And the projects are composed of the power plant dam the overflow dam the overflow dam with big orifices the overflow dam with deep orifices and the powerhouse behind dam The installed capacity is about 900000 kilowatts 6×15 ten thousand kilowatts and it is an item with synthesis benefits such as the flood prevention electricity generation irrigation shipping and cultivation It is called to be a great project for nature reform
This design includes the construction diversion and the design for foundation treatment
In the design we have fully proven the key position terrain landform condition in the place analysis the hydrology geology situation and the meteorological data and so on Considering the local construction condition the rests on each kind of hydraulic engineering standard we draw up the conduction current way that is to use the partition coffer dam law conduction current initially and the conduction current time interval is perennial diversion The conduction current standard is 20-year frequency flood according to the basic document Through the quantitative terms and the conduction current plan economical comparison the programmer for diversion is embankment cofferdam contracted river and the bottom orifice for releases In the design we use the rectangle diversion orifice in the diversion In the construction we determined the various types of construction machinery and the number by the calculation of works of the buildings In the closure work design we determined the different particle size and number of river materials the current situation through the river hydro calculation In the reference pit drainage design we determined the periods drainage equipment through the displacement calculation in every period
In basic processing component the use of blast by bore holes to excavate the dam foundation Blasting parameters an
您可能关注的文档
最近下载
- 部编人教版四年级下册语文 语文园地一 教案.docx
- 煤化工工程设计防火标准第五章建筑防火解读陈京老师.pdf
- 第七章 国际视野下的当代学前教育课程(7.2国际上学术导向下的学前教育课程).doc VIP
- 军歌100首歌词完整版.doc
- 2024年长沙电力职业技术学院单招职业技能测试题库往年题考.docx VIP
- 《望海潮》《扬州慢》比较阅读教学设计.doc
- 第七章 国际视野下的当代学前教育课程(7.1世界上部分政府政策导向下的学前教育课程).doc VIP
- 第二届全国乡村振兴职业技能大赛“育婴”赛项备考试题库资料500题(含答案).pdf VIP
- 2025年深圳市高三年级第一次调研考试 政治试卷(含答案).pdf
- 2024年部编版三年级下册语文第七单元综合检测试卷及答案.doc VIP
文档评论(0)