网站大量收购独家精品文档,联系QQ:2885784924

ASME 射线规程[精品].doc

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
ASME 射线规程[精品]

CONTENTS General 2 、Qualification of examination personnel 3 、Equipment, tools and materials 、Check of surface to be radiographed Examination 6、 Film processing 7、 Evaluation of radiographs 8、 Nonconformity control 9、 Records and archiving 1 GENERAL This procedure provides the X ray radiographic examination technique for butt welds of pressure vessels constructed in accordance with the requirements of the ASME Code Section Ⅷ Div,1. This procedure shall be supplemented with the examination instructions defining more specific variables which will be approved by NDE level III Examiner QUALIFICATION OF EXAMINATION PERSONNEL Any person engaged in this examination shall be qualified as radiographic examiner in Accordance with the requirements of HT?s Written Practice for NDE Personnel Training, Examination, Qualification and Certification No.HT0501-99, which is based on the requirements of SNT-TC-IA (current code accepted edition) The NDE level I shall receive the necessary instruction or supervision from a certified NDE level II or level III examiner. The NDE level II shall receive the instruction or supervision from a NDE level III examiner. According to the respective responsibility range, all examiners shall complete the examination conforming to the ASME Code, this procedure and the written instructions. They shall assure the working quality. 3 EQUIPMENT, TOOLS AND MATERIALS Level II examiner shall select the equipment, tools and materials and assure they are in compliance with The following conditions and the requirements of the examination instruction. 3.1 One of the X-ray equipment listed in Table 1 shall be used Table 1 Model Factory Max. Tube Voltage Max. Tube Current Effect Focal. Size(mm) Material Thick.(mm) 300 EG-B2LF (JIS) 300 kV 5 mA 2.3?2.3 60 mm XXH-3005 Dan Dong 300KV 5 mA 1.0?2.5 46 mm XXQ-3005 Dan dong 300KV 5mA 1.0?2.5 50mm 3.2 Film 3.2.1 Film selection shall be in accordance with SE-1815, st

您可能关注的文档

文档评论(0)

bodkd + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档