- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
外文文献翻译
()
译文字数:3800多字
文献出处:CA Wright. Power supply system of high-rise building design[J] Renewable Energy,2016,1(3):15-24
英文原文 Power supply system of high-rise building design
CA Wright
Abstract
With the continuous development of city size, more and more high-rise buildings, therefore high-rise building electrical design to the designers had to face. In this paper, an engineering example, describes the electrical design of high-rise buildings and some of the more typical issues of universal significance, combined with the actual practice of an engineering solution to the problem described.
Key words: high-rise building; electrical design; distribution; load calculation
1 Project Overview
The commercial complex project,with a total construction area of 405570m2,on the ground floor area of 272330m2, underground construction area of 133240m2, the main height of 99m. Project components are: two office buildings, construction area is 70800m2, 28 layers, the standard story is 3.2m.
2 Load Calculation
1) Load characteristics: electric load, much larger than the national civil engineering technical measures Large 120W/m2 indicators, especially in the electricity load more food, and different types of food and beverage catering different cultural backgrounds also high.
2) the uncertainty of a large load, because the commercial real estate rents are often based on market demand, and constantly adjust the nature of the shops, making the load in the dynamic changes.
3) There is no specification and technical measures in the different types of commercial projects refer to the detailed parameters of the shops, engineering design load calculation in the lack of data, in most cases to rely on staff with previous experience in engineering design calculations.
Load the selection of parameters: for the above problems, the load calculation, the first developer of sales and good communication, to determine the form of layers of the forms and nature of floor area, which is calculated
您可能关注的文档
- 汽车防盗报警器外文文献翻译中英文.doc
- 数据库管理系统外文文献翻译中英文.doc
- 公路线形设计外文文献翻译英文参考.doc
- 工程管理外文文献翻译混凝土施工.doc
- 二手物品交易网站外文文献翻译中英文.doc
- 网页设计与制作外文翻译文献中英文.doc
- 数控机床与原理外文文献翻译中英文.doc
- 变电站建设外文文献翻译中英文.doc
- 施工组织设计外文文献翻译中英文.doc
- SBS改性沥青外文翻译文献.doc
- 白银区大井子沟建筑用石料矿开采项目报告表.pdf
- 甘肃天鑫热力科技有限公司(省军区供热站)锅炉房建设项目报告表.pdf
- 甘肃天鑫热力科技有限公司(警备区供热站)锅炉房建设项目报告表.pdf
- 景泰县竞诚矿业有限责任公司年产5万吨石英石改扩建建设项目报告表.doc
- 黄河流域生态保护和高质量发展引大入秦延伸增效景泰生态供水工程环境影响报告书.pdf
- 靖远煤业集团刘化化工有限公司三聚氰胺尾气制硝铵改造利用项目报告书.doc
- 景泰县兴华石膏矿石膏、建筑石料用石灰岩及石英岩开采及加工项目报告表.doc
- 甘肃锐金混凝土有限公司搅拌站、机制砂建设项目报告表.pdf
- 西北矿冶研究院先进金属材料和矿用浮选药剂智能化中试基地项目环境影响报告书.pdf
- 甘肃省武威肿瘤医院兰州重离子DSA应用项目报告表.pdf
文档评论(0)