施工技术-散水施工工艺(The construction technology of water - Construction Technology) Apron construction technology I. construction preparation (I) operating conditions 1,???? the wall decoration has been basically completed, the scaffold has been removed, the apron base elevation and size are checked and hidden, pre screening procedures have been completed. 2,???? water should be the block placement, the block length is not more than 6m, seam position should consider the overall effect of building. 3??? A good horizontal pile?. 4,???? check the concrete mix, check the background of the opening of const