网站大量收购独家精品文档,联系QQ:2885784924

PMP范围管理.ppt

  1. 1、本文档共43页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PMP范围管理

Scope Management Why Scope Management So Important ? Story A: Story B Work Package 1 Conclusion First Money, then honey . Control Scope creep ! Chinese customer always think service is free !! Scope Management Scope Management Initiation Scope Planning Scope Definition Scope Verification Scope Change Control Scope Product scope – The features and functions that are to be included in a product or service Project scope – The work that must be done in order to deliver a product with the specified features and functions Successful completion of product scope is measured against the requirements; project scope is measured against the plan Initiation Formal authorization that the project exists Recognition the project should continue into the next phase Initiation Outputs Project charter PM assigned Constraints Assumptions Inputs Product description – Documents characteristics of the product or service that the project was undertaken to create and its relationship to the business need or other stimulus that gave rise to the project Strategic plan – Describes the organization’s mission, vision, and goals for the future, which the project supports Project selection criteria – Defined in terms of the product and covers the full range of management concerns Historical information – Results of previous project decisions and performance Tools Techniques Project selection methods (Decision models) Benefit-measurement methods – Comparative approaches; scoring models; benefit-contribution and economic models Constrained optimization methods – Mathematical models using linear, dynamic, integer, and multi-objective programming algorithms Expert judgment – Experts with specialized knowledge or training assess the inputs to this process Outputs Project charter Project manager selected Constraints – Factors that limit the project management team’s options regarding scope, staffing, and schedule Assumptions – Factors that, for planning purposes, will be considered to

文档评论(0)

xy88118 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档