- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
石油工程专业英语采油技术基础roductiontechnology
Lesson 3
Production Technology
Chapters 1 and 2 discussed in some detail the equipment and procedures used in drilling and completing a well. Now let’s consider the well as part of a dynamic production system. Up to this point, describing the static geologic structure has been a basic part of the exploration and development process. Wells are drilled and logged, maps are revised, and the reservoir begins to take shape as a volume having certain dimensions. (Big ones, hopefully!) But once production begins, the reservoir is only a part of a larger system that includes the reservoir, wellbore, tubing string, artificial lift equipment, surface control devices, gathering lines, separators, treaters, tanks, and metering devices. All of these elements behave according to their own specific performance relationships, but each, in turn, also depends upon and influences the other elements. Production engineers are concerned with the interaction of these performance relationships as production occurs over time, anticipating performance changes and designing the system to maximize recovery of oil and gas economically. Understanding this dynamic production system as well as the static geologic structure is a practical objective for everyone involved in the exploration and production effort.
This chapter outlines production system equipment, starting with the completed well and moving along the flow path through the surface facilities. The same path is then retraced, but this time focusing on the dynamic flowing performance relationships that govern fluid movement through the system.
3.1 Completion Components
The basis for any completion is the heavy steel pipe lining the wellbore?the casing. Together with the cement sheath holding it in place, the casing performs several important functions:
( supporting the sides of the hole;
( preventing communication of fluids and pressures between shallow and deep formations;
( allowing for control of pressures; and
( providing a base for
您可能关注的文档
最近下载
- 合肥万物生物石蜡切片 IFtune绿 + IF红 双标实验报告.pdf VIP
- 国开2022秋当代中国政治制度形考任务1-4答案.pdf
- 智能除草机器人.pptx VIP
- 2025年四川省乐山市井研县某国企招聘笔试题库附答案详解.docx VIP
- 液冷技术在数据中心节能中的应用.docx VIP
- 专题14 阅读理解C篇之首字母技巧方法及20篇专练(解析版)-2021-2022学年八年级英语下学期期末考点大串讲(牛津上海版).docx VIP
- 工业机器人系统操作员实操试卷(中级工)(试卷八).docx VIP
- 医疗器械质量保证措施.docx VIP
- 中建冬季施工方案.pdf VIP
- 中国打火机行业运行态势及未来发展趋势预测报告.docx
原创力文档


文档评论(0)