网站大量收购独家精品文档,联系QQ:2885784924

商作业务合同谈判(中文).doc

  1. 1、本文档共3页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
商作业务合同谈判(中文)

Project Supervision Contract Republic of China in this contract located by the Embassy of Nigeria (hereinafter referred to as owners to Ambassador Lu Fengding representative) for the party, a registered office address is Plot 343, Bamako Street, Zone 1, Wuse, Abuja, Nigeria, and Zhu Li Sibo cell (Nigeria) Limited Company (hereinafter referred to as B Company, represented by Heinz Stockhausen, general manager) for the other, the registered office address is Berger Junction, Utako District, Abuja, Nigeria, and sign at the end of the contract determined date and place . B Company has undertaken in view of the design and tendering of the Ambassadors residence hall and building works of the new owners (the Project), to complete the construction tasks better, ensure the quality and progress, control the investment, reflect the design of a complete and comprehensive concept, the owners have commissioned B Company assigned to participate in the engineering design firm of architects (the Supervision Engineer) is responsible for supervision of the project. The Parties hereby enter into this contract First, the responsibility of supervision engineers 1. Supervision engineer shall be subject to local laws, decrees, regulations, supervision activities normatively. 2. Supervision Engineer is authorized to inspect the progress, quality of the project on behalf of owners, have the right to propose amendments to the failed projects or the proposal of rework ,and put forward oral or written report for the owners . 3. Participate in the meeting site for the construction of proposed solutions to the problems which are found and take notes for the meeting. For the formation of the project, checkt the implementation one by one. 4. Before the end of the project supervision engineer with the professional engineer does the final inspection, and does the assessment of quality levels. 5. Submit engineering defect records in duplicate, as the evidence for the contractors and owners to cor

文档评论(0)

xy88118 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档