- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
商作业务合同谈判(中文)
Project Supervision Contract
Republic of China in this contract located by the Embassy of Nigeria (hereinafter referred to as owners to Ambassador Lu Fengding representative) for the party, a registered office address is Plot 343, Bamako Street, Zone 1, Wuse, Abuja, Nigeria, and Zhu Li Sibo cell (Nigeria) Limited Company (hereinafter referred to as B Company, represented by Heinz Stockhausen, general manager) for the other, the registered office address is Berger Junction, Utako District, Abuja, Nigeria, and sign at the end of the contract determined date and place .
B Company has undertaken in view of the design and tendering of the Ambassadors residence hall and building works of the new owners (the Project), to complete the construction tasks better, ensure the quality and progress, control the investment, reflect the design of a complete and comprehensive concept, the owners have commissioned B Company assigned to participate in the engineering design firm of architects (the Supervision Engineer) is responsible for supervision of the project. The Parties hereby enter into this contract
First, the responsibility of supervision engineers 1. Supervision engineer shall be subject to local laws, decrees, regulations, supervision activities normatively. 2. Supervision Engineer is authorized to inspect the progress, quality of the project on behalf of owners, have the right to propose amendments to the failed projects or the proposal of rework ,and put forward oral or written report for the owners . 3. Participate in the meeting site for the construction of proposed solutions to the problems which are found and take notes for the meeting. For the formation of the project, checkt the implementation one by one. 4. Before the end of the project supervision engineer with the professional engineer does the final inspection, and does the assessment of quality levels. 5. Submit engineering defect records in duplicate, as the evidence for the contractors and owners to cor
您可能关注的文档
- 初二上第一学期期中考试英语2.doc
- 初二下册第七单元测验.doc
- 初中英语教材教学指南七年级下册U5T1SC..doc
- 初中化学五年中考真题及答案.doc
- 初二一元一次不等式教案.doc
- 初二数学13章测试题.doc
- 初二数学第三周周周清.doc
- 初中三年级英语单词表文档.doc
- 初二英语Unit2Iammoreoutgoingthanmysister.单元检测.doc
- 初二语文家教-初二语文辅导-初中语文家教.doc
- 福莱特玻璃集团股份有限公司海外监管公告 - 福莱特玻璃集团股份有限公司2024年度环境、社会及管治报告.pdf
- 广哈通信:2024年度环境、社会及治理(ESG)报告.pdf
- 招商证券股份有限公司招商证券2024年度环境、社会及管治报告.pdf
- 宏信建设发展有限公司2024 可持续发展暨环境、社会及管治(ESG)报告.pdf
- 品创控股有限公司环境、社会及管治报告 2024.pdf
- 中信建投证券股份有限公司2024可持续发展暨环境、社会及管治报告.pdf
- 洛阳栾川钼业集团股份有限公司环境、社会及管治报告.pdf
- 361度国际有限公司二零二四年环境、社会及管治报告.pdf
- 中国神华能源股份有限公司2024年度环境、社会及管治报告.pdf
- 广西能源:2024年环境、社会及治理(ESG)报告.pdf
文档评论(0)