- 445
- 0
- 约3.22万字
- 约 21页
- 2018-05-12 发布于广东
- 举报
General Requirements to Construction of Substation
Substations are a vital element in a power supply system of industrial enterprises.They serve to receive ,convert and distribute electric energy .Depending on power and purpose ,the substations are divided into central distribution substations for a voltage of 110-500kV;main step-down substations for110-220/6-10-35kV;deep entrance substations for 110-330/6-10Kv;distribution substations for 6-10Kv;shop transformer substations for 6-10/0.38-0.66kV.At the main step-down substations, the energy received from the power source is transformed from 1
您可能关注的文档
- 风险投资在小型企业的作用-本科毕业设计(论文)外文参考文献译文及原文.doc
- 计算机网络新技术-毕业设计(论文)外文文献翻译作业.doc
- 单相AC- AC变换器补偿电压骤降和骤升-电气工程及其自动化外文文献翻译.doc
- 现场信息共享和通过高级可视化通信-毕业设计外文文献及译文.doc
- 有关中药的外文中药文献改.doc
- 大型空间机械臂设计方案和末端执行器的比较研究-毕业设计(论文)外文文献翻译.doc
- 关于弱电系统的设计-外文参考文献译文及原文.doc
- 农村及城市土地开发和土地所有权制度在南非和博茨瓦纳的比较-论文外文文献及译文.doc
- 计算机辅助夹具设计方法的回顾与分析-外文文献及译文.doc
- 吸引和留住人才-工商管理外文参考文献译文及原文.doc
- 十五五规划下科研仪器与试剂国产化对创新药研发的成本影响.pptx
- 十五五规划下生物防治技术迎来规模化投资窗口.pptx
- 十五五规划下生物医药基因疗法安全性监测投资机遇及体系.pptx
- 十五五规划下医药领域地理因素与区域流行病学的投资指向.pptx
- 合规红线与避坑实操手册(2026)《NBT 11517-2024矿用提升容器重要承载件无损检测方法与判定规则》.pptx
- 合规红线与避坑实操手册(2026)《NBT 11520-2024煤矿井下顺槽刮板转载机用迈步自移装置》.pptx
- 合规红线与避坑实操手册(2026)《NBT 11537-2024煤矿在用卡轨人车检测检验规范》.pptx
- 合规红线与避坑实操手册(2026)《NBT 11540-2024煤和岩石耐磨性测定方法》.pptx
- 合规红线与避坑实操手册(2026)《NBT 11542-2024煤矿巷道笼式锚索底板锚注支护技术规范》.pptx
- 合规红线与避坑实操手册(2026)《NBT 11541-2024顺层定向长钻孔预抽煤巷条带煤层瓦斯区域防突技术规范》.pptx
原创力文档

文档评论(0)