网站大量收购独家精品文档,联系QQ:2885784924

毕业设计论文-混凝土斜拉桥设计.doc

  1. 1、本文档共75页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
毕业设计论文-混凝土斜拉桥设计

摘要 近年来,由于高强钢材、正交异性板、焊接技术的发展及结构分析的进步,斜拉桥体系得到了广泛的应用。斜拉桥为空间结构,由加劲梁—钢或混凝土桥面板和支承部件—受压的桥塔与受拉的斜拉索组成,因其结构性能斜拉体系占据了梁桥和悬索桥的中间地位。 本设计为墩、塔、梁固结的单索面预应力混凝土斜拉桥,选择桥梁专用软件MIDAS来建模分析,计算该桥在自重、汽车、温度和支座沉降作用下的作用效应,并进行索塔的作用效应组合;但是,在自重作用下,成桥状态斜拉索的受力很不合理,故采用影响矩阵法对索力进行优化;再根据调整后的索力确定拉索的构造和下料长度;由于斜拉索水平分力的作用,索塔锚固区的混凝土会开裂,须在塔壁内配置闭合预应力筋。 关键词 斜拉桥;作用效应组合;索力优化;闭合预应力筋 全套CAD图纸,联系 Abstract Wide and successful application of cable-stayed systems was realized only recently, with the introduction of high-strength steels, orthotropic type deck, development of welding techniques and progress in structural analysis. Cable-stayed bridges present a space system, consisting of stiffening girders as steel or concrete deck and supporting parts as towers acting in compression and inclined cables in tension. By their structural behavior cable-stayed systems occupy a middle position between the girder type and suspension type bridges. The cable-stayed bridge is the single-plane and prestressed-concrete system, whose pier, tower and girder are rigidly joined together. The design chooses the special software for bridge-MIDAS to create model and run structural analysis, get the effect in the action of dead load, live load, temperature and bearing subsidence, and then calculate the combination for action effects at the tower. But cable force caused by structural weight is very unreasonable, so the design optimize the cable force using the Influence Array method. Then in accordance with the accommodated cable force, the design portrays the configuration of the cables and calculates their construction length. In the action of the horizontal force, the concrete of the anchorage at the tower will crack, so the closed prestressed-steel bar must be laid in the tower. Keywords cable-stayed bridge combination for action effects optimization of cable force closed prestressed-steel bar 目录 摘要.....................................................................................................................I Abstract.........

您可能关注的文档

文档评论(0)

2017meng + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档